Similar Projects
University Boulevard at Rouse Road Intersection Improvements
Bidding
$1,381,618 est. value
Orlando, FL 32800

Texas Avenue Roadway Improvements (from North of Duskin Avenue to South of Holden Avenue)
Infrastructure
Bidding
$20,485,221 est. value
Orlando, FL 32839

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Concrete and Asphalt Restoration Services
Infrastructure
Post-Bid
Orlando, FL

Easterly Wetlands Boardwalk
Results
$1,000,000 est. value
Orlando, FL 32802

Repave And Restripe The Gardenia Parking Lot
Results
Orlando, FL 32839

Buena Vista Drive North - Median Closure
Construction
Orlando, FL 32800

SheltAir FBO Parking Lot Expansion
Addition
Construction
Orlando, FL 32803

Hot In-Place Asphalt Recycling
Infrastructure
Bidding
$3,000,000 est. value
Orlando, FL

Cold In-Place Bituminous Base Recycling with Asphalt Resurfacing
Term Contract
Post-Bid
$13,057,755 est. value
Orlando, FL

Asphalt Rejuvenating Agent
Results
Less than $600,000 est. value
Orlando, FL 32802

Mill Creek Apartments - ADA Upgrades
Renovation
Construction
Orlando, FL 32822

Purchase and Installation of Bricks
Infrastructure
Bidding
Winter Park, FL

Silicone Joint Sealer
Infrastructure
Post-Bid

Asphalt Repair
Results
Less than $500,000 est. value

Reported 04/13/2022 04:15 PM
Project Title

Olympus Phases 1B And 2 Master Infrastructure Improvements

Physical Address View project details and contacts
City, State (County) Orlando, FL   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 04/15/22
Owner View project details and contacts
Architect View project details and contacts
Description

The contract will require contractors to provide for the construction, labor, materials, and equipment necessary to construct approximately 900 linear feet of widening roadway (from existing 2-lane to 4-lane divided), 200 linear feet of new 4-lane divided roadway, 3,200 linear feet of new 2-lane roadway with street parking and sidewalks, 2 roundabouts (one private and one Lake County), utilities, drainage conveyance and master pond regrading, and other associated incidental construction

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents