Similar Projects
Sewer Plant Expansion (SCRWA) - 303093 - City of Morgan Hill
Renovation
Conception
$19,500,000 CJ est. value
Morgan Hill, CA 95037

Headworks Facility Replacement - WQ-16002 - City of Palo Alto
Renovation
Conception
$43,996,900 CJ est. value
East Palo Alto, CA 94303

Rinconada Water Treatment Plant Reliability Improvement Project Phases 3-6
Renovation, Infrastructure
Bidding
$260,000,000 CJ est. value
Los Gatos, CA 95032

SCWP - Secondary Treatment and Thickening/Dewatering - CAS Stage 1
Infrastructure
Post-Bid
$250,000,000 CJ est. value
Sunnyvale, CA 94089

The Cleanwater Center Project
LEED Certification, New Construction, Infrastructure - 29,900 SF
Post-Bid
$42,000,000 CJ est. value
Sunnyvale, CA 94089

Digester No 4 Coating and Annular Seal Repair
Renovation
Results
Sunnyvale, CA 94089

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Tunnel Rehabilitation - City Of San Jose
Renovation
Conception
$27,638,292 CJ est. value
San Jose, CA 95134

RFQ - Master Agreement for General Engineering Consulting Services 2021
Term Contract
Post-Bid
$7,000,000 CJ est. value
San Jose, CA 95134

SCWP Filter Control Building - 833330 - City of Sunnyvale
Demolition, New Construction, Infrastructure
Conception
$5,800,668 CJ est. value
Sunnyvale, CA 94087

Existing Plant Rehabilitation Project
Renovation
Post-Bid
$45,000,000 CJ est. value
Sunnyvale, CA 94087

Sunnyvale Cleanwater Program Digester No. 5 - 833350 - City of Sunnyvale
New Construction, Infrastructure
Conception
$9,750,000 CJ est. value
Sunnyvale, CA 94087

Removal and Replacement of Odor Control Media Within Absorbtion Tank
Renovation
Post-Bid
$1,050,000 CJ est. value
San Jose, CA 95113

SCWP Food/FOG Waste Facility - 833360 - City of Sunnyvale
New Construction, Infrastructure
Conception
$2,021,789 CJ est. value
Sunnyvale, CA 94087

SCWP Cogeneration Upgrade - 833370 - City of Sunnyvale
Demolition, Renovation
Conception
$20,859,963 CJ est. value
Sunnyvale, CA 94087

Last Updated 04/17/2023 03:10 PM
Project Title

SCWP - Secondary Treatment and Dewatering Project

Physical Address View project details and contacts
City, State (County) Sunnyvale, CA 94087   (Santa Clara County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction Commenced, Request for Qualifications, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $277,872,751 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project No: 9265A10, PW22-17, UY-21-07 As of April 17, 2023, this project is under construction. Construction began early in 2023 and is expected to last a few years. All trades have been let. The City of Sunnyvale is seeking statements of pre-qualifications from licensed Electrical Subcontractors interested in providing a sub-bid on the UY-21-07 - Sunnyvale Cleanwater Program Secondary Treatment and Dewatering Project and/or UY-21-04 - Sunnyvale Cleanwater Program Existing Plant Rehab Project ("Projects") at the City's Water Pollution Control Plant (WPCP). All Prospective Electrical Subcontractors interested in providing a sub-bid on the above mentioned Public Works Projects at the City's Water Pollution Control Plant (WPCP) must be pre-qualified prior to submitting a sub-bid (Prospective Sub-Bidders) on either of those projects. The City will include a list of pre-qualified electrical contractors in the Prime Contract Bidding documents indicating that the Prime Contractor shall only solicit electrical sub-bids from the listed pre-qualified The Engineer's Opinion of Probable Construction Cost is approximately $200M (Total Project Construction Cost). The Engineer's Opinion of Probable Construction Cost for the electrical scope of work is approximately $30M (Total Project Construction Cost). The Engineer's Opinion of Probable Construction Cost is approximately $45M (Total Project Construction Cost) The Engineer's Opinion of Probable Construction Cost for the electrical scope of work is approximately $25M (Total Project Construction Cost). Deadline for Subcontractor's Questions December 10, 2021 Construction is anticipated to be completed by June 2026. Minority-Owned, Woman-Owned, and Small Business Enterprises are encouraged to respond to this solicitation. The purpose of the Secondary Treatment and Dewatering Project is to improve various components of the treatment process to meet anticipated future regulatory requirements. This project will build conventional activated sludge facilities, which will be the main method to provide secondary treatment. The existing ponds, air flotation tanks, and fixed growth reactors will remain in service to augment the new facilities during periods of high flow. Thickening and dewatering facilities will be constructed to handle the additional biosolids generated. Solids-handling equipment will be housed in a new building and the ventilated air will be treated by an odor control system. The project work includes the following items: 1. Demolition of the existing 63-inch storm drain pipes. 2. Construction of the new Bioreactors. 3. Construction of the new Blower Building. 4. Construction of the new Secondary Clarifiers. 5. Construction of the new RAS/WAS Pump Station. 6. Construction of the new Thickening/Dewatering Building. 7. Construction of the new Digested Sludge Storage Tank. 8. Construction of the new Thickened Sludge Blend Tank. 9. Construction of the new DEMON Sidestream Treatment. 10.Construction of the improvements to the existing DS supernatant pump station. 11.Construction of the new Standby Generator and Fuel Tank. 12.Additions and modifications to the WPCP paving, grading, and drainage systems. 13.Additions and modifications to the WPCP yard piping system. 14.Construction of a new utility trench. 15.Electrical system improvements, including replacement of the 12.47kV service from PG&E. 16.Instrumentation and control system improvements. The estimated cost for this Work is between: $250M.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents