Similar Projects
Yellowtail Spillway Concrete Repair
Renovation
Results
$1,000,000 to $5,000,000 est. value
Fort Smith, MT 59035

French Dam Operating Gate Replacement Project
Renovation
Post-Bid
Saco, MT 59261

Middle Creek Dam Tower Safety Improvement
Renovation, Term Contract
Post-Bid
Helena, MT

Monida Creek Dam 1 and 2 Reconstruction
New Construction
Design
$250,000 to $5,000,000 est. value
Bannack, MT

Charles M Russell Refuge Repairs
Renovation
Post-Bid
Glasgow, MT

BLM, NCMD, Glasgow Field Office, Valley County Reservoirs Repair and Reclaim 2022
Renovation
Bidding
$100,000 to $250,000 est. value
Glasgow, MT 59230

Last Updated 06/15/2022 08:43 AM
Project Title

GAOA Grub Dam Rehabilitation

Physical Address View project details and contacts
City, State (County) Glasgow, MT 59230   (Valley County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Dewater reservoir and construction area. Excavate a portion of the existing dam embankment and foundation to remove existing outlet works pipe and construction of the new outlet works. Reconstruct the dam embankment including a. Placement of compacted fill from onsite borrow source b. Placement of compacted lime amended fill c. Placement of imported riprap within excavated areas of the upstream face d. Placement and compaction of imported sand and gravel for internal filter and drain features. Construct precast concrete spillway riser for a new principal spillway. Construct concrete encased, precast reinforced concrete pipe outlet conduit. Construct precast concrete low-level inlet structure. Construct a reinforced cast-in-place concrete impact stilling basin structure. Place road gravel surfacing along the crest of the dam. Lower access road through the auxiliary spillway discharge channel. Reclaim all disturbed areas including staging areas and temporary roads. Reclamation consists of preparation of the soil for seeding but does not include seeding. Seeding of the reclaimed areas will be completed by Others.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Riprap, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents