Similar Projects
Roof Replacement at Centennial Hall and Grasso Hall WCSU Westside Campus
Bidding
Danbury, CT 06810

Ferrara Elementary Portable Classroom Roof Replacement
Bidding
East Haven, CT 06513

Town Hall Upper Flat Roof Repairs
Term Contract
Post-Bid
Clinton, CT 06413

Reroofing at Birchwood Terrace
Post-Bid
Danielson, CT 06239

Norwalk Roof and HVAC Department of Motor Vehicles Branch Office Facility
Results
$831,343 to $875,097 est. value
Norwalk, CT 06851

Flanders Elementary School Roof Replacement
Results
Less than $866,345 est. value
East Lyme, CT 06333

Sage Park Middle School Roof Replacement
Bidding
Windsor, CT 06095

Design-Build Services for Roof Replacement at Anamet Property
Post-Bid
Waterbury, CT

Partial Roof Replacement at Southington High School
Results
Southington, CT 06489

Siding And Roof Sealing
Post-Bid
Stamford, CT 06901

Partial Roofing Replacement at Ben Franklin Community Center - Phase 2
Results
Less than $300,000 est. value
Norwalk, CT 06854

Nunnawauk Meadows - Roofing
Post-Bid
Newtown, CT 06470

Roof Replacement at Andover Public Works Facility
Results
Less than $53,000 est. value
Andover, CT 06232

Roof Improvements at Wolfe
Post-Bid
New Haven, CT

Partial Roof Replacement Tolland Middle School
Results
Less than $2,295,000 est. value
Tolland, CT 06084

Last Updated 12/30/2019 03:46 PM
Project Title

Roof Project at Bolton Heritage Farm House

Physical Address View project details and contacts
City, State (County) Bolton, CT 06043   (Tolland County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,200
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Remove existing shingle and underlayment to sheathing 2. Protect all of existing structure. Protect from weather at all times 3. Remove existing drip edge and flashing 4. Evaluate roof deck for rot or delamination. Replace with new 3/4" plywood at an additional rate as needed. Specify price per sheet in proposal 5. Provide and install ice and water barrier up the first 6 feet starting at the eves 6. Provide and install ice and water barrier in valleys up a minimum of 18” from center on both sides. 7. Provide and install ice and water barrier at all roof penetrations and where roof abuts side walls. 8. Provide and install seam tape at all plywood seams 9. Provide and install synthetic underlayment on the remainder of the roof deck. 10. Provide and install new drip metal drip edge on perimeter. 11. Provide and install new aluminum vent stack flashing. 12. Provide and install new 30 year lifetime architectural shingles of which the town will pick the color from samples provided by the contractor. 13. Provide and install new cap shingles at the peaks. 14. Provide and install new counter flashing at chimney and other locations as necessary. 15. Remove and replace any damaged or rotted wood fascia/trim boards. 16. Remove and replace any damaged or rotted wood soffits. 17. Replacement wood should be primed on all sides and painted once attached to match the existing paint on house with two coats of exterior grade paint. 18. All materials removed/replaced shall be the responsibility of the contractor to properly dispose of and all lawn areas shall be restored to pre-construction conditions. 19. Contractor is responsible for all dumpster fees, permits, inspections and taxes.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents