Similar Projects
Last Updated | 03/09/2021 08:48 AM |
Project Title | Mechanical Equipment and ATC System Replacement at Southern Middle School |
Physical Address | View project details and contacts |
City, State (County) | Lusby, MD 20657 (Calvert County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC, Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 to $10,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of the project includes the replacement of all air distribution equipment (AHU’s, RTU’s) and associated piping and ductwork, cooling plant equipment including water cooled chiller, cooling tower, chilled water and condenser water pumps, and existing locally controlled automatic temperature control system in its entirety and replacing with a direct digital control system utilizing electric/electronic actuation. All existing VAV boxes shall be provided with a retrofit kit (Trane boxes) or DDC controls. All thermostats, controllers, control valves, pneumatic actuators, etc. shall be replaced in their entirety in a fully turnkey fashion. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |