Similar Projects
Founders Park Parking Lot Improvements
Infrastructure
Bidding
Lake Saint Louis, MO 63367

North Cool Springs Precast Box
Infrastructure
Bidding
O'Fallon, MO 63366

2021 Bank Stabilization & Navigation Project (Bsnp) Structures Repair
Term Contract
Post-Bid

Swale and Culvert Work
Alteration
Post-Bid
Saint Peters, MO 63376

City Hall Parking Lot Maintenance and Improvements
Results
Weldon Spring, MO

2021 District Concrete
Results
Dardenne Prairie, Lake Saint Louis, O'Fallon, Wentzville, MO 63385

Pinkerton Properties Warehouse
New Construction, Alteration - 24,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
O'Fallon, MO 63366

Chicken N Pickle
New Construction, Term Contract - 32,923 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Saint Charles, MO

36 Sanitite Hp Triple Wall Pipe
Infrastructure
Post-Bid
O Fallon, MO

Lakeside Parking Lot Seal and Stripe
Infrastructure
Results
Saint Peters, MO

Plastic Pipe Liner, HDPE Pipe, and Polypropylene
Infrastructure
Post-Bid
Saint Charles, MO

Laura Drive Drainage Improvements
Infrastructure
Results
$320,000 est. value
O Fallon, MO

Corrugated Metal Pipe
Infrastructure
Post-Bid
Josephville, Saint Charles, Saint Peters, Wentzville, MO 63385

Mill and Overlay Parking Lot at Spencer Creek Park
Infrastructure
Results
Saint Peters, MO

West Meyer Road Phase 3
Infrastructure
Results
Wentzville, MO

Last Updated 02/01/2022 11:56 AM
Project Title

Sidewalk and Drainage Improvements

Physical Address View project details and contacts
City, State (County) Saint Charles, MO   (Saint Charles County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of replacement of the flagstone sidewalk with a new sidewalk that facilitates pedestrian activities and site visitation, meets requirements of the ADA, incorporates improvements to the site interpretive center entrance, and conveys storm water away from the historic structure.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Concrete Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents