Similar Projects
2023 Water System Improvements
Demolition, New Construction, Infrastructure
Bidding
$4,000,000 CJ est. value
Jefferson, WI 53549

Buchanan 2023 Roadway Construction
Infrastructure
Bidding
$2,000,000 CJ est. value
Buchanan, WI 54130

Pressure Reducing Valve Repairs
Infrastructure
Sub-Bidding
$460,000 CJ est. value
Bayfield, WI 54814

District Wide Bottle Filler Stations - Bid Package 2
Alteration
Post-Bid
Milwaukee, WI 53228

Lead Service Line Program
Alteration
Post-Bid
Juneau, WI

Elevator Replacement, Roger Harring Stadium -MEP
Results
$675,000 est. value
La Crosse, WI 54601

Blackwell Job Corps Center Water Heater Replacement
Term Contract
Results
$25,000 to $100,000 est. value
Brodhead, Laona, WI 54541

Steam and Condensate Repairs
Renovation
Construction
$169,500 CJ est. value
Waupun, WI 53963

Steam and Condensate Repairs
Renovation
Construction
$169,500 CJ est. value
Waupun, WI 53963

Wastewater Treatment Facility Upgrade
New Construction, Infrastructure, Renovation
Bidding
$200,000 CJ est. value
Wonewoc, WI 53968

Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

Plumbing and Steamfitter Services at WVH-UG
Term Contract
Results

Exterior Envelope Repair - Lathrop Hall and Van Vleck Hall
Renovation
Construction
$5,290,000 CJ est. value
Madison, WI 53706

Isolation Rooms
Demolition, Alteration
Post-Bid
Oneida, WI

Touchless Plumbing Retrofits
Alteration
Results
Milwaukee, WI 53207

Last Updated 01/04/2023 02:39 PM
Project Title

Hudson's Well #8 Pump and Column Repair 2023

Physical Address View project details and contacts
City, State (County) Hudson, WI 54016   (Saint Croix County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $48,557 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Hudson Public Utilities is soliciting proposals for the following work that includes furnishing all labor, tools, equipment, and appurtenances required to evaluate, rehabilitate, test, and service well pump to depths of 205 feet of column, vertical line-shaft, pump, plus tail piece. This specified scope of work terminates at the well discharge head. Parts and materials will be furnished by the Contractor with prior approval from Hudson Public Utilities. This is one of two well pump repairs for 2023. This pump needs to go first. This needs to be reinstalled before two of two is pulled Work to be completed by March 31,2023. Hudson Public Utilities is soliciting proposals for the following work that includes furnishing all labor, tools, equipment, and appurtenances required to evaluate, rehabilitate, test, and service well pump to depths of 205 feet of column, vertical line-shaft, pump, plus tail piece. This specified scope of work terminates at the well discharge head. Parts and materials will be furnished by the Contractor with prior approval from Hudson Public Utilities. This is one of two well pump repairs for 2023. This pump needs to go first. This needs to be reinstalled before two of two is pulled. Execution: o Prior to pump removal the contractor shall record the pre-lube time, gallons per minute pumping, The voltage, the amp draw, the Hz at which the pump is pumping if (VFD), water level, and the vibration of the upper and lower motor frame. o Remove motor, 205 feet of column, pump shaft, pump, 1" PVC with 3/8" airline, water level probe and tail piece. o Reinstall motor, 205 feet of column, pump shaft, pump, 1" PVC with 3/8" airline, water level probe and tail piece o The well pump motor shall be loaded onto a Hudson Public Utilities Vehicle. We will have a local motor shop examine the electric motor. o Disassemble, clean, and Inspect components for signs of wear and deterioration. o Make recommendations the Hudson Public Utility for needed repairs or replacement of parts. No repairs shall be made without prior approval from the Utility. o Components shall be put within manufactures specifications before reinstallation o The well is to be videoed. A copy of the video shall be provided to the utility on a thumb drive. o The well depth shall be checked and recorded. Any major variations in depth shall be reported to the Hudson Public Utilities. o Disinfect well prior to pump installation. o After reinstallation, the contractor shall record the pre-lube time, gallons per minute pumping, the voltage, the amp draw, the Hz at which the pump is pumping if (VFD), water level, and the vibration of the upper and lower motor frame. Bid Result Well #8 Pump & Column Keys Well Drilling $22,521.25 Well #10 Pump & Column Municipal Well & Pump $26,036.00

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents