Project Title | Tree and Brush Removal Followed by Subsequent Cycles of Slope Mowing |
Physical Address | View project details and contacts |
City, State (County) | Gainesville, FL 32641 (Alachua County) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $297,500 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Counties: Alachua, Bradford Road Name: Gainesville Maintenance Outfall and Pond Mowing Limits: Midpoint Project(s): 41021347255(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 00 Days (acq. time) One initial cycle of tree and brush removal followed by subsequent cycles of slope mowing and litter removal to maintain outfall ditches and retention ponds that may be saturated or have standing water as listed in the bid items and appendix within state maintained right of ways. Work will include mowing berms, slopes and ditch bottoms. Hand tools and power equipment such as hand trimmers and specialized mowers may be required to perform the work. All grass and vegetation will be mowed to a height of 6 inches plus or minus 1/2 inch. When determined by the Engineer, certain areas, due to location, may be cut to a height of 4 inches plus or minus 1/2 inch. Mobilization and Maintenance of Traffic are incidental to the pay items listed. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. FDOT - Call Order: 006 - Tree and Brush Removal Followed by Subsequent Cycles of Slope Mowing |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |