Similar Projects
Belmont Park - Phase II - Spotsylvania County
New Construction, Infrastructure
Conception
$475,000 est. value
Mineral, VA 23117

Lee Hill Park Lighting Replacement - Spotsylvania County
Alteration
Conception
$397,000 est. value
Fredericksburg, VA 22408

Chancellor Baptist Church Master Plan
Addition, Renovation, Infrastructure
Design
$2,000,000 CJ est. value
Fredericksburg, VA 22407

2023 Plant Mix - Secondary
Infrastructure
Bidding
$3,289,000 CJ est. value
Spotsylvania, VA 22551

2023 Plant Mix - Secondary
Infrastructure
Bidding
$5,518,000 CJ est. value
Spotsylvania, VA 22551

EVMS Campus Master Planner
New Construction
Post-Bid
Norfolk, VA

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

Holbert Building Elevator Number Two Modernization
Renovation
Results
Spotsylvania Courthouse, VA 22553

William Square - Amelia House and Hotel Fredericksburg
New Construction - 139,198 SF
Construction
Fredericksburg, VA 22401

Porchlight Commons
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Fredericksburg, VA 22408

Porchlight Commons
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Fredericksburg, VA 22408

New General Government Office Building - Spotsylvania County
New Construction, Infrastructure
Conception
$8,500,000 CJ est. value
Spotsylvania, VA 22553

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23325

Case Coal, Llc Bond Forfeiture
Alteration
Results
$110,000 to $180,000 est. value
Duffield, VA 24244

Last Updated 10/28/2022 07:07 PM
Project Title

Alta Alexander's Crossing Phase 1 / Fredericksburg

Physical Address View project details and contacts
City, State (County) Fredericksburg, VA 22408   (Spotsylvania County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from Developer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: New multifamily development on approximately 23 acres. (9) 3-story residential buildings, (1) 4-story residential building for a total of 364 units. Additional structures include a freestanding clubhouse with outdoor pool and courtyard, a maintenance building/car wash/dog spa structure and (12) detached garages with a total of 72 spaces. The total project duration is expected to be 20 months

Details

4 Stories Above Grade, 493,520 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents