Similar Projects
Cooling Water Modifications at the Jones Island Water Reclamation Facility
Renovation
Bidding
$200,000 est. value
Milwaukee, WI 53207

Jones Island Water Reclamation Facility, Building 203 Grit Dewatering Screws #1, 2 and 3 Repairs
Renovation
Bidding
$125,000 est. value
Milwaukee, WI 53207

Water Treatment Services
Term Contract
Post-Bid
Black River Falls, WI 54615

Digester Cover Rehabilitation Project
Renovation
Post-Bid
Less than $300,000 est. value
Waupaca, WI

Scum Concentrator Overhaul and Scum Press Replacement
Results
Oak Creek, WI 53154

Contract A - Wastewater Treatment Facility
Results
$6,500,000 est. value
Jefferson, WI

Operations Building Elevator Modernization
Renovation
Post-Bid
$100,000 est. value
Madison, WI 53713

Clarifier 4, 5 and 6 Effluent Launder Replacement
Results
Madison, WI 53713

On-Call Construction Services for Repairs to Aeration Basins at South Shore Water Reclamation Facility
Renovation, Term Contract
Post-Bid
Oak Creek, WI 53154

Wastewater Treatment Plant Upgrades - Sludge Processing
Results
Weyauwega, WI 54983

WWTF Renovation
Renovation
Post-Bid
Hatley, WI 54440

WRRF - Blower Upgrade 2021
Results
$1,200,000 est. value
Platteville, WI

Osmosis Plant at the Calumet County Park
New Construction
Post-Bid
Hilbert, WI 54129

O'Dells Bay WWTF Upgrade
Results
Less than $2,000,000 est. value
Germantown, WI

Dryer Indefinite Quantity Services
Term Contract
Post-Bid
Milwaukee, WI 53207

Last Updated 05/13/2022 05:38 AM
Project Title

Wastewater Treatment Plant Upgrade

Physical Address View project details and contacts
City, State (County) Poynette, WI   (Columbia County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of the wetwell covers in the raw room, installation of the stairs and railing to the digester tank, installation of the ship ladder and railing to sludge storage tank, piping modification and pump, probe installation at the fermentation tank, electric valve actuators installation in the process room, generator replacement, SCADA system upgrade, and electrical work.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents