Similar Projects
Jackson Woods Southeast
New Construction
Conception
Jackson, NJ 08527

Ohr Chaim Meir High School
New Construction
Conception
Lakewood, NJ 08701

The Ewing Boutique Hotel
Addition - 19,670 SF
Design
$14,400,000 est. value
West Cape May, NJ 08204

The General's Retreat
New Construction, Renovation - 6,226 SF
Design
Lambertville, NJ 08530

Furnishing of Swimming Pool Repairs, Services and Supplies
Bidding
NJ

On-Call Swimming Pool Maintenance
Term Contract
Bidding
Trenton, NJ 08611

South End Pool and Pavilion Reconstruction
New Construction
Post-Bid
Spring Lake, NJ 07762

Aquatics Rehabilitation and Maintenance Services
Post-Bid
Jersey City, NJ

Swimming Pool Renovation at Phillipsburg Elementary School
Results
Phillipsburg, NJ 08865

South Plainfield Community Pool Renovation
Results
South Plainfield, NJ 07080

South Beach at Long Branch Condominiums
New Construction, Demolition - 100,000 SF
Construction
$50,000,000 est. value
Long Branch, NJ 07740

Autumn Park at Medford
New Construction - 2,984,000 SF
Construction
$10,000,000 CJ est. value
Medford, NJ 08055

The Place at Marlboro
New Construction - 2,800 SF
Conception
NJ

The Halo
New Construction - 1,171,142 SF
Design
$10,000,000 CJ est. value
Newark, NJ 07102

Modifications to the Pool and Bath House
Post-Bid
Oakhurst, Ocean, NJ 07755

Reported 02/20/2020 12:00 AM
Project Title

Various Improvements to Municipal Pool

Physical Address View project details and contacts
City, State (County) Waldwick, NJ 07463   (Bergen County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract includes the following: 1. Remove and replace the two (2) main drains (low point suction outlets) at new locations as shown on the Plans 2. Install new piping to accommodate relocated main drains; 3. Remove mechanical flow controllers and install Variable Frequency Drive (VFD) flow controllers on existing pumps; 4. Install cup anchors as shown on the Plans; 5. Remove and replace two (2) shallow end ladders with interior steps and handrail; 6. Clean existing pumps, including replacing plugs with drain valves 7. Remove and replace top 6” layer of sand in each filter and replace filter cover yoke.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents