Similar Projects
RFP - Parks Water and Sewer Infrastructure Feasibility Study
Term Contract
Conception
Winberry, OR 97438

UO Retainer Program - Consulting Services - Extended Period
Renovation, Term Contract
Bidding

Geotechnical and Environmental Consulting Services Qualified Pool
Infrastructure
Bidding
Eugene, OR

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

Public Works Energy A-E Services - Worldwide
Renovation
Post-Bid
$40,000 to $3,000,000 est. value

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

RFP - Glenwood Riverfront Master Plan
Term Contract
Bidding
Springfield, OR 97477

Heritage Renovation Project
Renovation, Term Contract
Post-Bid
Eugene, OR

RFP - Property Management Services for Commercial Real Estate
Term Contract
Bidding
Eugene, OR 97401

Architect-Engineering Services to Support The Us. Air Force and AFECE Environmental Program Worldwide "AE ES 2022"
Term Contract
Post-Bid

RFQ - General Planning Services Qualified Pool
Term Contract
Bidding
Eugene, OR 97401

Engineering - Engineering Services Amazon Creek Bridge at Bailey Hill Road
Infrastructure
Post-Bid
Eugene, OR 97408

RFP Engineering - Engineering Services Goodpasture Island Road over Delta Highway Bridge Rehabilitation
Infrastructure
Bidding
$100,000 CJ est. value
Eugene, OR 97401

On-Site Mini Blind Cleaning and Repair
Term Contract
Post-Bid
Eugene, OR

RFP - Engineer of Record
Term Contract
Bidding
Westfir, OR 97492

Last Updated 05/25/2023 10:23 AM
Project Title

RFP Design - Mckenzie Intake and Raw Water Pump Station

Physical Address View project details and contacts
City, State (County) Springfield, OR 97477   (Lane County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Construction start expected January 2025 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $42,900,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

SUB reserves the right to reject any and all proposals. Question Deadline 06/21/2023 at 4:00 PM PT The Class 4 construction cost estimate for Phase 1 of the conventional treatment facility is $26,700,000. The Class 4 construction cost estimate for Phase 2 is $9,700,000. For Phase 3, the Class 4 construction cost estimate is $6,500,000 if two new flocculation and sedimentation basins and two new filters are constructed. If the basins and filters constructed in Phase 1 and Phase 2 are uprated and no new basins are constructed, the Phase 3 construction cost estimate is reduced to $1,000,000. The total estimated build out construction cost in 2016 dollars for conventional treatment with six flocculation and sedimentation basins and eight filters is $42,900,000. The total estimated build out construction cost in 2016 dollars for conventional treatment with four flocculation and sedimentation basins and six filters is $37,400,000.

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents