Similar Projects
Exterior Envelope Repairs and HVAC Upgrades of Building 1 at the Cincinnati Job Corps Center, Cincinnati, Ohio
Post-Bid
$1,000,000 to $5,000,000 est. value
Cincinnati, OH 45214

OUE Campus Chiller Replacements 2019 Design/Build
Post-Bid
Less than $650,000 est. value
Saint Clairsville, OH

USCG HVAC Maintenance and Repair Ohio
Results
Cleveland, OH 44114

Historical Society - Neighborhood Facility Improvements Project
Results
$40,045 est. value
Logan, OH

White Hall Mechanical and Building Improvements Design/Build
Construction
$900,000 est. value
Kent, OH 44240

Public Auditorium Music Hall Air Handling Units
Post-Bid
Cleveland, OH 44114

Bldg Exhaust System
Results
Catawba Island, OH 43452

Construction Manager at Risk - East Quad Dorm Fresh Air 2020 Project
Post-Bid
Less than $980,000 est. value
Oxford, OH 45056

Steam Humidification System Repairs & Replacement of Cooling Tower Fill Project
Results
$250,000 to $500,000 est. value
Cleveland, OH 44113

Purchase of One (1) SCBA Compressor
Post-Bid
Dayton, OH

Two Modular Unit(S) With Two Classrooms
Results
Bowling Green, OH

Fawcett Exhaust Fan
Post-Bid
Less than $470,000 est. value
Dayton, OH

Football Building HVAC Project
Results
Less than $68,807 est. value
Whitehouse, OH 43571

North Residential HVAC Modifications Phase 1
Post-Bid
Less than $3,850,000 est. value
Columbus, OH 43210

Installation of A/C Units and Sensors at Sixteen Building Locations
Results
Springfield, OH 45501

Last Updated 10/08/2020 12:12 PM
Project Title

Y--Mace House HVAC

Physical Address View project details and contacts
City, State (County) Chillicothe, OH 45601   (Ross County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install a new 800 Amp main panel (NEMA 1) in B244 and retie 10 existing circuits to new panel and provide one new 300A circuit to feed new exterior panel at Mace House. Install a new 400 Amp service with exterior panel (NEMA 4) with new 350 kcmil conductors from B244 in existing conduit as shown on the plans. Install new electrical feeders to the Mace House, B60 and re-tie the existing Mace House panel and Starter House panel back into the new 400 Amp panel. Provide NEMA 4 communication junction box for cables. Install two new Split HVAC systems (heat pumps) in the Mace House. Demolish existing residential style water boiler in the basement of the Mace House. Construct one chase wall (wood frame and sheetrock) on second floor to conceal duct work. Contractor to furnish all labor, materials and equipment as necessary. Archeological monitoring during the excavation must be provided per the specifications.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents