Similar Projects
U-Haul of FSU
New Construction - 37,422 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Tallahassee, FL

Cypress Lake United Methodist Church Multipurpose Facility
New Construction, Addition - 18,262 SF
Conception
$500,000 to $1,000,000 CJ est. value
Fort Myers, FL

Safe and Secure Storage
New Construction - 110,000 SF
Design
$10,000,000 CJ est. value
Coral Springs, FL 33065

Storage King USA
New Construction - 110,583 SF
Design
$7,000,000 est. value
Hollywood, FL 33020

Tommy's Express Car Wash P2545
New Construction - 3,415 SF
Sub-Bidding
$1,505,377 est. value
Port Saint Lucie, FL 34984

Bee Safe Storage and Wine Cellar
New Construction - 113,553 SF
Post-Bid
$10,000,000 CJ est. value
Stuart, FL 34997

City Garage and Public Facilities Storage Building Compound
Post-Bid
Roseland, FL 32958

Construction Management at Risk (CMAR) Services for the Nassau Water Reclamation Facility (WRF) Upgrade Projects
Results
Less than $550,000 est. value
Fernandina Beach, FL 32034

Development of Waterway Estates Property
New Construction
Results
Fort Myers, FL 33903

Margate Self Storage
New Construction - 133,872 SF
Construction
$8,507,085 est. value
Margate, FL 33063

Crews Commerce Center Industrial Park - Phase II
New Construction - 1,290,240 SF
Construction
$27,900,000 est. value
Orlando, FL 32824

Pristine Self Storage
New Construction, Renovation - 17,653 SF
Conception
Tallahassee, FL

Safe & Secure Self Storage
New Construction - 220,100 SF
Design
$10,000,000 CJ est. value
Oakland Park, FL 33311

OUC St Cloud Operations and Maintenance Facility
New Construction - 300,000 SF
Post-Bid
Orlando, FL 32800

Northview High School - Wastewater Treatment Plant
Results
$600,000 est. value
Century, FL 32535

Last Updated 01/26/2022 11:21 PM
Project Title

Cypress Manor Wastewater Treatment Facility Plant Improvements

Physical Address View project details and contacts
City, State (County) Dade City, FL 33523   (Pasco County)
Category(s) Commercial, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of constructing a new wastewater treatment system. The work includes, but is not limited to, installation of a new Modified Ludzack-Ettinger (MLE) biological treatment process, installation of a new concrete foundation, civil site work, installation of a new premanufactured building for plant operations, and electrical upgrades.

Details

Sewage Treatment Plant, New Construction, Warehouse/Storage, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents