Similar Projects
Operations Building at Main Lane Plaza 7 HVAC Upgrades
Bidding
$100,000 to $200,000 est. value
Plano, TX 75075

1 Yr BPO SDC Chiller Maintenance
Bidding
TX 75075

FY20 HVAC Maintenance and Service
Term Contract
Post-Bid
Arlington, Bonham, Carrollton, Cleburne, Corsicana, Dallas, Decatur, Denton, Duncanville, Ennis, Fort Worth, Granbury, Grand Prairie, Greenville, Hurst, Irving, Kaufman, Lake Worth, Lewisville, McKinney, Mesquite, Mineral Wells, North Richland Hills, Plano, Richardson, Sherman, Stephenville, Terrell, Watauga, Waxahachie, Weatherford, TX 76103

Fume Hood Inspections for Science Labs
Term Contract
Post-Bid
Plano, TX 75074

Collin County Public Works HVAC Replacement
Results
$130,000 est. value
McKinney, TX 75069

William High School HVAC Replacement Project
Results
$1,795,354 est. value
Plano, TX 75074

Exhaust Hoods Cleaning & Certification Services
Bidding

Haggard and Hendrick Middle Schools Cooling Tower Replacement
Post-Bid
Less than $300,000 est. value
Plano, TX 75025

Blue Ridge High School HVAC Equipment
Results
Blue Ridge, TX 75424

Frisco ISD - Summer 2021 - HVAC
Post-Bid
Less than $2,000,000 est. value
Frisco, TX

Vent-A-Hood Cleaning Service
Term Contract
Results
$12,880 est. value
McKinney, TX 75071

HVAC and Mechanical Products
Term Contract
Post-Bid

Plano Senior High School HVAC Replacement Project
Results
$3,263,068 est. value
Plano, TX 75075

HVAC Equipment Removal and Installation Only
Post-Bid
Anna, TX

Municipal Center HVAC Renovations Phase 2 and 3
Results
Plano, TX 75074

Last Updated 04/14/2021 12:29 PM
Project Title

Plano ISD Sockwell Center Roofing and RTU Replacement

Physical Address View project details and contacts
City, State (County) Plano, TX 75093   (Collin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the removal of existing roofing and sheet metal flashings and wood blocking, installation of new CTEM roofing and sheet metal trim and flashings, and installation of new wood blocking. The scope of work also includes removal of all existing rooftop packaged HVAC units and existing curbs, installation of new rooftop packaged HVAC units on new curbs, repair of existing metal roof deck and installation of new structural supports to accommodate new unit curbs. Work shall also include modifications to existing electrical and gas systems to accommodate the new rooftop packaged HVAC units and controls upgrades. The estimated construction budget for this project is $908,500 (Roofing $420,000 and RTU $ 408,500) Owner's Contingency $80,000 (Roofing $40,000 and RTU $40,000).

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents