Last Updated | 05/22/2021 02:56 AM |
Project Title | Inspection for 424/390 and 706/501 and 84/495 |
Physical Address | View project details and contacts |
City, State (County) | PA (Luzerne County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering, Inspection Services |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Part 1 SR 424 SEC 390, ECMS 70467, Extension of SR 424, road construction, latex overlays, bridge approach slabs, bioretention basins, turning lanes added to intersections, overall project length 1.77 miles. Luzerne County. Anticipated Project Duration: 3/29/2021 to 10/2/2023 (3 season duration)Anticipated staffing needs: 4 Inspectors, (2) TCI must have NECEPT Bituminous Certification, (1) TCI must have PennDOT Concrete Technician Certification, (1) TCI must have traffic inspection experience. Part 2 ECMS 9745, Bradford to Rush, Intersection improvement on State Route 706 and State Route 267; 100% state funds, bridge replacement of three bridges on State Route 706 over Branch Wyalusing Creek ; one culvert extension on State Route 706, bridge removal on State Route 3037 over Branch Wyalusing Creek, overall project length 0.78 miles. Susquehanna County.Anticipated Project Duration 4/26/2021 to 11/23/2022 (2 season duration)Anticipated Staffing Needs: (2) Inspectors, both (2) TCI must have PennDOT Concrete Technician Certification. Part 3 ECMS 87795 Interstate roadway reconstruction on Interstate 84 Eastbound and Westbound from the Palmyra Rest Area to Exit 34 including bridge rehabilitation/replacement of 11 bridges over State Route 390, Egypt Creek, Tributary of Blooming Grove Creek, Private Road, North Branch of Mountain Run Creek, Shohola Creek in Blooming Grove and Palmyra Townships, overall project length 18.00 miles. Pike County.Anticipated Project Duration: 3/28/2022 to 11/3/2025Anticipated Staffing Needs: (6) Inspectors and (1) Transportation Assistant , (2) TCI must possess PennDOT Concrete Technician Certification, (2) TCI must possess NECEPT Bituminous Certification, (1) TCI must possess E & S inspection experience. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |