Similar Projects
Skiffes Creek Connector
Post-Bid
VA

Buffalo Creek Bicycle/Pedestrian Bridge And Trail Project
Results
Farmville, VA

Rehabilitation of Granby Street Bridge
Results
$5,824,129 to $5,969,035 est. value
Norfolk, VA 23510

Waterloo Historic Bridge Restoration over Rappahannock River
Results
Less than $5,547,126 est. value
VA

Churchland Bridge Replacement Project
Results
$29,500,000 est. value
Portsmouth, VA 23701

I-95 NB Rappahannock River Crossing (Design-Build Project)
Results
Less than $132,500,000 est. value
Fredericksburg, VA

Botanical Gardens Cobblestone Bridge Replacement
Results
Less than $1,496,825 est. value
Norfolk, VA 23510

SRG- Bridge Replacement over Bell Creek
Results
Less than $3,887,000 est. value
VA

Bridge Repair over Appomattox River
Results
Less than $1,335,000 est. value
VA

Bridge Replacement Over Cedar Creek
Results
Less than $2,142,000 est. value
VA

Bridge Replacement Over Smith Creek
Results
Less than $1,464,000 est. value
VA

SGR Major Bridge Rehab over I-395
Results
Less than $13,766,000 est. value
VA

Bridge Replacement on Route 58 over Powell River
Results
Less than $7,141,000 est. value
VA

SGR - Bridge Rehab SBL Over Dragon Run
Results
Less than $3,500,000 est. value
VA

Bridge Joint Trough Rehab
Results
Less than $700,000 est. value
VA

Last Updated 04/27/2021 04:28 PM
Project Title

West Glebe Road Bridge

Physical Address View project details and contacts
City, State (County) Arlington, VA   (Arlington County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,500,000 to $12,000,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide superstructure replacement and substructure repair on West Glebe Road bridge over Four Mile Run and to construct approach roadways and sidewalks transitioning to the new structure. The bridge connects Arlington County on the north side of the bridge to the City of Alexandria on the south side of the bridge. The DB shall replace the superstructure on West Glebe Road bridge (NBI Structure # 5901) in a manner that improves safety and eliminates the structural deficient condition. The Project will include removing the existing prestressed concrete superstructure and constructing a new superstructure with steel girders and a concrete deck. The Project will also include new sidewalks to tie into the new superstructure and modifications to the intersection with South Glebe Road. The Design-Builder will work closely with Arlington County and City of Alexandria to design and furnish architectural features and enhanced lighting.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents