Similar Projects
Repair Fire Protection System & Renovate H250
Build-out, Renovation
Bidding
$25,000,000 CJ est. value
LrAFB, AR 72099

Renovation of CMTC Building 1361 Supply and Administration at Fort Chaffee
Renovation
Post-Bid
Fort Smith, AR

Construction of CMTC Building 1589 Parking Lot Resurface at Fort Chaffee
Renovation
Post-Bid
Fort Smith, AR

Multiple Award Construction Contract (MACC)/Indefinite-Delivery Indefinite-Quantity (IDIQ)
Renovation
Results
$150,000,000 est. value
Jacksonville, AR 72202

Repair Swimming Pool and Facility
Renovation, Term Contract
Results
$100,000 to $250,000 est. value
Fort Smith, AR

Renovation of CMTC Building 1757
Renovation
Post-Bid
Fort Smith, AR

Renovation of CMTC Building 1507 Dining Facility at Fort Chaffee
Renovation
Results
Fort Smith, AR

Renovation of CMTC Building 1672
Renovation
Post-Bid
Fort Smith, AR

Renovation Of Cmtc Building 1518 Located At Fort Chaffee
Renovation
Results
Little Rock, AR

RMTC Building 17300 Expansion and Renovation
Renovation
Post-Bid
North Little Rock, AR 72115

Renovation of CMTC Building 1450
Renovation
Results
Little Rock, AR

Maintenance, Repair, Replacement, Demolition, And Construction Work For Arkansas National Guard Locations
Renovation
Post-Bid
$5,000 to $10,000,000 est. value
Fort Smith, AR

Renovation of CMTC Building 1531
Renovation
Results
$100,000 est. value
Fort Smith, AR

Barracks Alterations - CMTC Building 1513 Renovations
Renovation
Post-Bid
Fort Smith, AR

Barracks Alterations - CMTC Building 1514 Renovations
Renovation
Post-Bid
Fort Smith, AR

Last Updated 10/19/2022 09:03 AM
Project Title

RFQ - Quality Conditioning Chambers (QEF) Preventative Maintenance, Calibration, and Equipment Repair Pine Bluff Arsenal

Physical Address View project details and contacts
City, State (County) White Hall, AR 71602   (Jefferson County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

GENERAL INFORMATION: 1.1 Overview: This is a non-personal services contract to provide semi-annual preventative maintenance and calibration services on QEF conditioning Chambers F-40-CHMV-705-705 (serial number 35119 and SM-32-3800 (serial number 34539) as described in this Performance Work Statement (PWS) at Pine Bluff Arsenal (PBA). The U.S. Government (USG) shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be solely accountable to the Contractor; who, in turn is responsible to the USG. 1.2 Description of Services: The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the services defined in this PWS except for those items specified as USG furnished property and services. The contractor shall perform to the standards in this contract. The Contractor shall follow the appropriate OSHA Regulations, Army and Arsenal Regulations. 1.3 Objective: Ensure the two QEF Conditioning Chambers receive timely and technically sufficient preventative maintenance, calibration and equipment repair to ensure properly functioning conditioning chambers at all times. 1.4 Period of Performance: The period of performance shall be for one base year of 12 months and one 12-month option. Base period Date of Award - 365 Days after award Option Year I 366 days after Start of Work - 730 days after start of work 1.5. General Information: 1.5.1. Quality Control: The contractor shall develop and maintain an effective Quality Control Program (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor's quality control program is the means by which it assures that all work product complies with the requirement of the contract. The QCP shall be delivered with the proposal. The QCP shall be submitted to the KO and COR within five working days of any modification thereafter. 1.5.2 Quality Assurance: The USG shall evaluate the contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the USG must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). The method of contractor selection has not been determined at this time.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents