Similar Projects
Exterior West Stairwell
Bidding
$40,000 est. value
Canton, MA 02021

Decking Replacement
Bidding
$16,000 est. value
Walpole, MA

Installation of Granite Kitchen Countertops, Sinks and Faucets - Rose Forte
Post-Bid
Stoughton, MA

Wood Preservation
Post-Bid
Quincy, MA

Bolivar Aquatic Complex - Filed Sub Bid
Results
Less than $4,800,000 est. value
Canton, MA

Bolivar Aquatic Complex - Filed Sub Bid
Results
Less than $4,800,000 est. value
Canton, MA

Brookline Reservoir Gatehouse Interior Renovation
Post-Bid
Less than $110,000 est. value
Brookline, MA 02445

15 Pleasant Street - Toilet Room Upgrades
Results
$30,000 est. value
Stoughton, MA

Blackburn Hall Facade Restoration
Post-Bid
Less than $95,000 est. value
Walpole, MA

Unit Turnover #18 Pine Knoll
Results
$28,000 est. value
Norfolk, MA

Boyden Elementary School Exterior Brick Restoration
Post-Bid
Less than $45,000 est. value
South Walpole, MA

Modernization of 10 Bathrooms
Results
$88,000 est. value
Dedham, MA

On Call Board and Plastering City Wide
Post-Bid
Quincy, MA 02169

Remove Remaining Existing Suspended Ceilings and Metal Grids
Results
Less than $30,000 est. value
Stoughton, MA 02072

Furnish and Install Privacy Walls at Boston Fire Headquarters
Post-Bid
Boston, MA

Reported 11/08/2019 03:03 PM
Project Title

Administration Office Relocation, King Philip Middle School

Physical Address View project details and contacts
City, State (County) Norfolk, MA 02056   (Norfolk County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Finishes/Interior
Contracting Method Competitive Bids.
Project Status All Bids Rejected, Project to Rebid
Bids Due View project details and contacts
Estimated Value $50,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the conversion of an existing classroom located on the lower level to the new Administration Office. The construction in general will include the removal of an existing exterior aluminum framed window and masonry below and the installation of a new aluminum door, the construction of a new secure vestibule with a transaction window, minor flooring modifications, minor carpentry, re-using existing ceiling tiles and light fixtures, modifications to the existing unit ventilator and piping and painting. Located across the corridor room 300 will require the installation of a new exterior aluminum framed window with new window air conditioner and new electrical outlet.

Details

Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents