Similar Projects
Smithbridge Rd. Corridor(L)
Infrastructure
Conception
$2,895,000 CJ est. value
Chadds Ford, PA 19317

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Sun Center Hotel & Tourist Attraction
New Construction - 108,000 SF
Design
$175,000 est. value
Aston, PA 19014

Marshall Rd o/ Cobbs Creek
Infrastructure, Renovation
Design
$12,440,000 CJ est. value
Upper Darby, PA 19082

Additions and Renovations to Worrall Elementary School
Addition, Demolition, Renovation, Infrastructure
Bidding
$12,000,000 CJ est. value
Broomall, PA 19008

I-476: I-76 Interchange to I-95
Infrastructure
Bidding
$60,000,000 CJ est. value
Nether Providence Township, PA 19086

Demolition and Site Restoration
Demolition, Infrastructure
Post-Bid
Darby, PA 19023

Observatory Park Recreational Improvements
Infrastructure
Post-Bid
$500,000 CJ est. value
Darby, PA 19023

Newtown Township Line Restoration Projects
Infrastructure
Results
$53,026 CJ est. value
Newtown Square, PA 19073

Mckinley Park Tot Lot Site Improvements
Infrastructure
Results
Lansdowne, PA 19050

Villanova University - St Mary`s Hall Gymnasium Pool Infill
Construction
Villanova, PA 19085

Estates at Coventry Woods Phase 2A
New Construction, Infrastructure
Pending Verification
$10,500,000 CJ est. value
Springfield, PA 19064

Aronimink Club Golf Learning Center
Addition, Demolition, Infrastructure - 12,710 SF
Pending Verification
$2,000,000 CJ est. value
Newtown Square, PA 19073

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

State Rd o/Darby Creek
Infrastructure, Renovation
Design
$9,020,000 CJ est. value
Media, PA 19063

Last Updated 05/03/2023 04:37 PM
Project Title

Residence Inn by Marriott Hotel / Newtown Square

Physical Address View project details and contacts
City, State (County) Newtown Square, PA 19073   (Delaware County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $8,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 13, 2022 the project is in planning. No building permits have been submitted into the City of Newtown Township. Information regarding the architect and general contractor has not been disclosed. A firm construction timeline has not been set, however, construction is not expected to begin prior to summer 2023. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

4 Stories Above Grade, 26,613 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents