Similar Projects
Salt Lake City New Water Reclamation Facility Project
Sub-Bidding
Less than $400,000,000 est. value
Salt Lake City, UT

Rozel State 18 Well Plug
Post-Bid
Less than $1,674,000 est. value
Salt Lake City, UT

Utah State Correctional Facility Gmp 2.02 Rough Grading and 2.03 Deep Utilities
Post-Bid
Salt Lake City, UT 84116

Z--(Con)(660) Demolish Building 1 G Zone (Va-18-00075144)
Demolition
Results
Salt Lake City, UT

Main Street Property Development
Results
Less than $120,000 est. value
Midvale, UT

DFCM Construction-DABC New Herriman Liquor Store
New Construction - 13,600 SF
Construction
Less than $3,100,000 est. value
Herriman, UT

Trucking Yard
New Construction
Pending Verification
Magna, UT

Magna Main Street Multiple Site Development
Post-Bid
Magna, UT

City Hall Entry Improvements Project
Results
Riverton, UT

Discovery UPC
Post-Bid
$50,000 est. value
Salt Lake City, UT 84104

Frontage Improvement Project
Results
Riverton, UT 84065

Adesa Auto Auction
Renovation
Post-Bid
$550,000 est. value
Salt Lake City, UT 84104

Saratoga Springs - Road Development
Results
Less than $6,250,000 est. value
Salt Lake City, UT 84045

Construction Bates Central Kitchen, Site Drainage and Grading
Results
West Valley City, UT

Demolition of Buildings and Site Improvements
Demolition
Results
Less than $50,000 est. value
Salt Lake City, UT

Reported 07/31/2019 12:00 AM
Project Title

Dutton Cement Work

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description Cement work, grounding, and trenching for a solar project located on Mount Dutton which is about 15 miles south of Junction, Utah. The project will consist of pouring 18 piers for solar panel mounts, pouring a 9’x3’ pad for a propane tank, installing a ground ring, and digging two 150’ trenches to connect the solar panel power and ground system to the communications building.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents