Similar Projects
Last Updated | 04/12/2023 09:15 AM |
Project Title | Hot Mix Asphalt Resurfacing and Guardrail Reconstruction, Signal Work, Lighting and Approach Work on M-96 |
Physical Address | View project details and contacts |
City, State (County) | Battle Creek, MI 49037 (Calhoun County) |
Category(s) | Heavy and Highway, Outdoor Lighting |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Abandoned, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $3,941,409 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of April 11, 2023, the project has been placed on hold indefinitely. The project is not expected to be rebid individually, however, it is expected to be included as a part of a larger bid package in the future. 0.232 miles of hot mix asphalt resurfacing and guardrail reconstruction, bridge rehabilitation including deep overlay, partial deck replacement, expansion joint replacement, structural steel repair, substructure patching, concrete surface coating, full depth deck and steel repairs, signal work, lighting and approach work on M-96 (Columbia Avenue) over I-194 in the city of Battle Creek, Calhoun County. This project includes a 2 year concrete surface coating warranty. Control Sec Job No Federal No IM 13033 208435A 23A0078 Net classification required for this project is 3335 Fa In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of N9-3G. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. MIDOT - 2212 036 - Hot Mix Asphalt Resurfacing and Guardrail Reconstruction, Signal Work, Lighting and Approach Work on M-96 MBE (7.2%), WBE (6.9%), DBE (4%) |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |