Similar Projects
Holmes Run Pump Station Rehabilitation
Renovation
Bidding
$8,000,000 to $12,000,000 est. value
Falls Church, VA 22044

Graham Park Sewage Pumping Station and Force Main Replacement
Bidding
Triangle, VA 22172

Raw Wastewater Pumping Rehabilitation A/E Services
Post-Bid
$77,200 to $106,200 est. value
Fairfax, VA

Annual Services Construction Contract 1 for Public Utilities Infrastructure
Term Contract
Post-Bid
Virginia Beach, VA

Water Treatment Plant Modernization and Chrisman Mill Pump Station projects
Results
$24,000,000 est. value
Radford, VA

Building 508 Repair Wet Well Pump Station
Results
$500,000 to $1,000,000 est. value
Portsmouth, VA

Smith Farms Sanitary Sewage Pump Station
New Construction
Construction
$75,000 est. value
Yorktown, VA 23693

Route 50 Pump Station Replacement
Post-Bid
Winchester, VA

Lower Accokeek Pump Station
Results
$3,768,344 est. value
Stafford, VA 22555

Plaza Bethune Pump Station No. 519 Replacement and Force Main Rehabilitation
Post-Bid
Less than $1,773,150 est. value
Virginia Beach, VA 23456

Johnson Creek Wastewater Pump Station
Results
$8,067,444 est. value
Chester, VA 23836

Crozet Flow Equalization Tank and Pumping Station Upgrade
Post-Bid
Charlottesville, VA

Construction of Arts and Conference Center Pump Station 114
Results
$1,000,000 to $2,999,999 est. value
Virginia Beach, VA 23456

Pump Station 23 Service Area Phase 8
Post-Bid
Norfolk, VA

Oak Forest Pump Station Abandonment Project
Results
$959,491 est. value
Charlottesville, VA 22900

Last Updated 03/25/2021 02:25 AM
Project Title

Rady Park Pump Station Replacement

Physical Address View project details and contacts
City, State (County) Warrenton, VA   (Fauquier County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide construction services to remove and replace the Rady Park Pump Station located at 550 Evans Avenue. 1. Remove existing submarine pump station 2. Replace station with enclosed building 3. Provide emergency backup gas generator 4. By-pass pumping to maintain station operations

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents