Similar Projects
Red Del Papa Well House (IF) - 731130 - City of Tooele
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Tooele, UT 84074

Townhomes on Willow
New Construction, Infrastructure
Conception
$37,000,000 CJ est. value
Grantsville, UT 84029

Fire Station Building 3 - City of Tooele
New Construction, Infrastructure - 15,000 SF
Design
$4,000,000 CJ est. value
Tooele, UT 84074

MUNI - Subdivision - Residential Subdivision / 600 East 2400 North - Cook Builders
New Construction, Infrastructure
Design
Tooele, UT 84074

Demolition and Removal of the Dugway Master Radio Station Towers and Bases for the National Climate & Water Center (NWCC)
Infrastructure
Bidding
$400,000 CJ est. value
Dugway, UT 84022

New Burt Brothers Tires and Service
New Construction, Infrastructure
Post-Bid
$700,000 CJ est. value
Tooele, UT 84074

RFP Construction Manager - TTC Expansion & Renovation
New Construction, Infrastructure - 12,000 SF
Post-Bid
$19,250,000 CJ est. value
Tooele, UT 84074

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

Park Well House and Waterline
Infrastructure
Results
$2,376,624 CJ est. value
Tooele, UT 84074

Boyer Lakeview One / Grantsville
New Construction, Infrastructure - 500,000 SF
Construction
$106,000,000 CJ est. value
Grantsville, UT 84029

Western Acres Phase 1
New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Tooele, UT 84074

Tagg N Go Car Wash / Tooele
New Construction, Infrastructure - 55,756 SF
Pending Verification
$1,000,000 CJ est. value
Tooele, UT 84074

Breezeway Apartments
New Construction, Infrastructure
Pending Verification
$8,000,000 CJ est. value
Tooele, UT 84074

Rush Valley Firework Restriction 2022
Infrastructure
Design
Rush Valley, UT 84069

2022 Bulk Water Stand Pipe
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Erda, UT 84074

Last Updated 09/21/2023 03:07 AM
Project Title

RFP CM and General Contract Services for Phase I - Deseret Peak Complex

Physical Address View project details and contacts
City, State (County) Grantsville, UT 84029   (Tooele County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Tooele County is requesting proposals from a qualified company to provide Construction Management and General Contract Services for Phase I of the Master Plan for the Deseret Peak Complex. Be responsible for the construction management and general contracting of Phase I of the Master Plan build at the Deseret Peak Complex in accordance with Think Architecture and Tooele County. Coordinate weekly owner's and architect's meetings on site for progress updates and coordination. Provide a guaranteed maximum price for all work outlined in the construction documents. Provide County with post construction activities including but not limited to, as built documentation, warranty inspections, GPS'd locations of key underground utilities, junction boxes, irrigation valves, etc. Solicit and evaluate all sub-contract bids. Provide recommendations and bids of all subcontractors to County and Think after bid-solicitation as to which sub-contractors are recommended. County and Think, in consultation with the Offeror, will make subcontractor decisions. Change order review and control. Any and all sub-contractors are to provide all labor, tools, equipment, permits, engineering, plans, and any and all other costs necessary to the design, layout, and construction. Offeror shall be responsible to ensure that all personnel proposed under this RFP are qualified through, training, experience, and appropriate certification for the tasks assigned and shall have a working knowledge of the task to be performed. Ability to work with other contractors as needed i.e. playground contractors. Due to policy, Tooele County will be purchasing large structures and it will be offerors responsibility to work with installers or install the structures. Large structures can include playgrounds, pavilions, shade structures, bathrooms, storage buildings, etc. Questions Due Sept 15, 2023 @ 5pm Tooele County reserves the right to reject any or all proposals submitted or make modifications to the scope of work, subject to appropriate negotiation. Tooele County agrees to not discriminate based on age, race, religion, sex, color, national origin, marital status, family status, source of income, sexual preference, mental or physical disability in review of the proposals or execution of agreements to the work. This RFP does not constitute any form of offer to contract. Tooele County will not pay any costs incurred by the proposer in preparing or submitting the proposal.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents