Similar Projects
Wiley Boulevard Trail From 16th Avenue SouthWest To Williams Boulevard (Highway 151) - 325052 - City Of Cedar Rapids
Infrastructure
Conception
$300,000 CJ est. value
Cedar Rapids, IA 52404

TIF Blairs Ferry Road Improvements And 18th Avenue Extension - 301881 - City Of Cedar Rapids
Infrastructure
Conception
$333,000 CJ est. value
Cedar Rapids, IA 52401

Two Basketball Courts at Hughes Park
Infrastructure
Design
$500,000 CJ est. value
Cedar Rapids, IA 52404

Cedar Rapids Flood Risk Management Project, Reach 2 - P1 - E-F Road Closure, A-Ave Pump Station, Tree of Five Seasons Floodwall, 2nd Ave Road Closure
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Cedar Rapids, IA 52401

Cedar Valley Nature Trail Rehabilitation Along Ely Road
Infrastructure
Post-Bid
$79,000 CJ est. value
Cedar Rapids, IA 52227

Wanatee Park Hard Surface Parking Areas
Infrastructure
Post-Bid
$350,000 CJ est. value
Marion, IA 52302

Seminole River Bank - Armoring and Access Improvements
Infrastructure
Results
$880,000 est. value
Cedar Rapids, IA

Plains Campground Expansion
Infrastructure
Results
Less than $100,000 est. value
Central City, IA

Duane Arnold Solar I
New Construction, Infrastructure
Pending Verification
$64,000,000 CJ est. value
Palo, IA 52324

Kwik Trip - 1st Avenue NE / Cedar Rapids
New Construction, Infrastructure
Pending Verification
$2,400,000 CJ est. value
Cedar Rapids, IA 52402

42nd Street Northeast from Edgewood Road to Wenig Road - 3012188 - City of Cedar Rapids
Infrastructure
Conception
$7,700,000 CJ est. value
Cedar Rapids, IA 52402

dupeRFQ Design - The Eastern Iowa Airport
Addition, Demolition, Infrastructure
Post-Bid
$6,000,000 CJ est. value
Cedar Rapids, IA 52404

Landscaping - U.S. 30
Infrastructure
Results
IA

Jones Park Repurposing - 307075 - City of Cedar Rapids
Infrastructure
Pending Verification
$500,000 CJ est. value
Cedar Rapids, IA 52401

Walford Road from 6th Street to Earhart Lane - 301947 - City of Cedar Rapids
Infrastructure
Conception
$3,305,000 CJ est. value
Cedar Rapids, IA 52404

Last Updated 11/16/2022 01:28 PM
Project Title

Mount Vernon-Lisbon Police Department Additions and Renovation

Physical Address View project details and contacts
City, State (County) Mount Vernon, IA 52314   (Linn County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,106,500 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project consists of Renovations and addition to the existing Police Station. Wood framed sally port addition consisting of approximately 1,200 sf of wood framed construction. Includes stripping, fill and grading of existing site, sectional overhead doors, cast in place concrete, wood roof trusses, lap siding, batt insulation, exterior painting, asphalt shingles, heating, plumbing, electrical, lighting, and concrete paving. Project also includes renovations to approximately 4,600 sf of the existing building including select demolition, wood framing, gypsum board, wood doors, hollow metal door and window frames, aluminum windows, carpet, acoustical ceiling tile, ceramic tile, interior painting, plastic laminate casework, new forced air heating and cooling, electrical, lighting, and plumbing systems. Bid Type: One lump sum contract will be awarded at the appointed time and place. Plans and specifications governing construction of the proposed project have been prepared by Martin Gardner Architecture PC., Marion, Iowa as Architect. All materials and procedures shall be in strict accordance with said plans and specifications referred to and defining said proposed improvements and are hereby made a part of this Advertisement and of the proposed contract by reference, and that the contract shall be executed in compliance therewith. All other Subcontractors and Suppliers may obtain one set of Construction Documents upon delivery of a $250 per set refundable deposit made payable to the Architect but delivered to Rapids Reproductions Cedar Rapids office. A link to the drawings and specifications are also available at the architect's website www.MartinGardnerArch.com. Plans and specifications to be viewed are in Adobe .pdf format and may be downloaded and printed. Be aware that no warranty as to the compatibility of your computer software or hardware with the files provided is made. Variations between the printed files provided above by the Architect and these electronic files may exist. In the event that a conflict does exist, the printed documents issued by the Architect will take precedence over the downloaded files. Bid Forms: All bids shall be on the forms provided in the specifications for project. The provided forms of proposal shall be submitted at the time required for bids "Form of Proposal for General Construction Unit Prices" shall be submitted electronically to the Architect's office within 24 hours of the bid opening by the apparent low Bidder and other Bidders requested by the Architect. Failure to submit this bid in the time requested may result rejection of a Bid as non-responsive. Each bid shall be accompanied by a bid bond, certified check, cashier's check or credit union certified share draft, in a separate sealed envelope in an amount equal to five percent (5%) of the total amount of the bid. If bid bond is submitted, it must be on an approved AIA bid bond form. The certified check or cashier's check shall be drawn on a bank in Iowa or a bank chartered under the laws of the United States of America; certified share draft shall be drawn on a credit union chartered under the laws of the United States. Bid security should be made payable to the Owner as security that if awarded a contract the bidder will enter into a contract at the prices bid and furnish the required Contractor's Bonds, Certificate of Insurance, and other materials as may be required in the contract documents. The certified check, cashier's check, or certified share draft may be cashed, or the Bid Bond forfeited, and the proceeds retained as liquidated damages if the Bidder fails to execute a contract and file acceptable Certificate of Insurance within ten (10) days after the acceptance of the proposal by the Owner. No bidder may withdraw a proposal forty-five (45) days after the date set for opening bids. Project Bonding: The successful bidder shall be required to furnish a Contractor's Performance and Labor and Material Payment Bond on an approved AIA form in an amount equal to one hundred percent (100%) of the contract price. The bonds are to be issued by responsible surety, approved by the Owner, and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for and of all materials and protect and save harmless the Owner from all claims and damages of any kind caused by the operation of the Contractor, and shall guarantee the work contracted for a period of one (1) year from the date of final acceptance of the improvements by the Owner Sales Tax: The said project is a tax-exempt project. The Owner will issue exemption certificates from the Iowa Department of Revenue, as specified in the 701 Iowa Administrative Code, Chapter 19, Rule 19.12. These certificates shall be used by the successful bidder when purchasing materials or the completion of the project. Award of Contract: Notice is hereby given that the Owner will meet at the location and time designated above at which time and place the Owner will consider bids for said construction. Progress Payments: Payment to the Contractor will be made in monthly estimates and one final payment. Monthly estimates will be equivalent to ninety-five percent (95%) of the contract value of the work completed during the preceding calendar month. Such payments will in no way be construed as an act of acceptance for any of the work partially or totally completed. Final Payment: Final payment to Contractor will be made no earlier than forty-five (45) days from and after final acceptance of work by the Owner, subject to the contract conditions and in accordance with the provisions of Iowa Code chapters 26 and 573. Project Construction Schedule: The work under the contract shall commence on or before the date specified in the written 'Notice of Proceed' or if lieu of the notice to proceed, the execution of the contract for construction and shall be Substantially Completed on or before date set by General Contractor on bid form and fully completed and ready for acceptance no later than 30 days after. Iowa Preference: By virtue of statutory authority, preference will be given to products and provisions grown and produced within the State of Iowa and to Iowa domestic labor. The Owner hereby reserves the right to reject any or all bids and to waive informalities and irregularities and to accept the lowest responsive and responsible bid. Location- 380 Old Lincoln Hwy Mount Vernon, IA 52314

Details

,, 5,800 SF - 1,200 SF. 4,600 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents