Similar Projects
Southwest Lift Station Construction
Renovation
Bidding
Provo, UT

1500 East Force Main Improvements Project
Renovation
Bidding
Vernal, UT

Autoliv AOA Pump House Addition
Addition - 425 SF
Post-Bid
Ogden, UT 84401

2019 Payson City Spring Lake Pump House Modifications
Post-Bid
Payson, UT 84651

Sewer Pump Station 1
Results
Less than $12,000,000 est. value
Salt Lake City, UT

Eaglewood Pump Station - NSL Project
Results
$500,000 to $1,000,000 est. value
North Salt Lake, UT 84054

Sandy City Well and Pump Station Maintenance Services (2020/21)
Post-Bid
Sandy, UT 84070

Construction of the Booster Pump Station
Results
Less than $55,000 est. value
Herriman, UT 84096

6200 South Zone C Pump Station
Term Contract
Post-Bid
West Jordan, UT 84081

SLC Airport Pumphouse Station #1
Results
Salt Lake City, UT 84122

Construction of the Walmart Lift Station
Post-Bid
Richfield, UT

Virgin River Pumphouse Renovation
Renovation
Results
$200,000 to $500,000 est. value
Saint George, UT

Stonebridge Maintenance Variable Speed Pump Station Replacement
Post-Bid
West Valley City, UT 84120

Sewer Lift Station Grinders
Results
Roy, UT 84067

Concrete Lined Pond and Pump Station
Post-Bid
Highland, UT 84003

Reported 01/28/2021 12:00 AM
Project Title

Booster Pump Station #3 Rehabilitation

Physical Address View project details and contacts
City, State (County) Ogden, UT 84310   (Weber County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes furnishing all labor, tools, materials, equipment, transportation and services required for the construction of pump house for the existing Pizell #3 culinary water spring at the above described location, in Weber County Utah. BASE WORK consists of the following items of work: mobilization, traffic control, and erosion control; clearing and grubbing work areas; all required general earthwork, including general excavating, backfilling, construction of embankments, grading, and compacting; furnishing, placing and compacting sub-base fill material; furnishing and placing borrow material for embankments and fill; constructing reinforced concrete pump pedestal; constructing concrete pump house, including all required earthwork, concrete work, metal door & frame, carpentry work, insulation, concrete roof, removable roof hatch, with; plumbing system (pump, piping, and controls) supplied and installed by others, electric unit heaters, and electrical system supplied and installed by others; standby generator supplied and installed by others; connecting new pump discharge pipe to existing pipe line; furnishing and installing 1- inch poly-pipe and fittings for pump pre-lubrication system; furnishing and installing new HDPE 4-inch water line connection to existing waterline; furnishing, placing and compacting new gravel surfaces; placing and compacting new concrete surfaces; furnishing, including gravel road base; and all appurtenant work;

Details

Division 03 - Concrete.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 31 - Earthwork.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents