Similar Projects
Brazos Lakes Mixed-Use Development
New Construction - 263,160 SF
Conception
$10,000,000 CJ est. value
Missouri City, TX 77459

Parkhaus Development
New Construction
Conception
New Braunfels, TX 78130

Royal Caribbean Cruise Terminal
New Construction - 170,000 SF
Design
Galveston, TX 77550

Office Building & Parking Garage
New Construction - 240,000 SF
Design
$10,000,000 CJ est. value
Dallas, TX 75254

Life Time Fitness
New Construction - 253,000 SF
Post-Bid
$130,000,000 est. value
Shenandoah, TX

Women & Children’s Bed Tower and Associated Projects - Package 12
New Construction - 570,000 SF
Post-Bid
$10,000,000 CJ est. value
San Antonio, TX 78229

Parking Garage III
Results
El Paso, TX

City Hall Annex Garage - Structural Repairs - Hurricane Harvey
Results
$283,000 est. value
Houston, TX

Stacy Green
New Construction
Construction
Allen, TX 75013

Gatherings at Twin Creeks
New Construction
Construction
Allen, TX 75013

Northeast Methodist Hospital Parking Garage
Addition - 83,000 SF
Pending Verification
$6,300,000 est. value
San Antonio, TX 78233

4411 San Felipe Mixed Use
New Construction
Pending Verification
Houston, TX 77027

White Oak Mixed Use Development
New Construction
Conception
Houston, TX 77009

Costco Parking Garage
Renovation
Design
Dallas, TX 75236

Asphalt Parking Replacement
Post-Bid
Carthage, TX 75633

Last Updated 03/11/2021 07:39 AM
Project Title

Pressler Street Garage 2 - Design Build

Physical Address View project details and contacts
City, State (County) Houston, TX 77030   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $21,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

HUB Goal is 21.1%. The project scope will include site development, which includes utility infrastructure work, construction of the exterior shell and core, and the limited interior finish-out of the facility. The goal is to construct a new garage facility to help meet the institution's parking facility needs. This facility is anticipated to be a free-standing, 1,200-car (minimum) parking garage of approximately 570,000 gross square feet (GSF), to be located on Pressler Street along Fannin Street, and adjacent to the Dan L. Duncan Building. This facility primarily will serve the needs of workforce members who currently park in the garage adjacent to Mid Campus Building 1 but who do not work in that facility.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents