Similar Projects
Wastewater Treatment Plant Number 2 Lift Station to Serve
Bidding
Houston, TX 77002

Force Main R/R for Lift Stations
Post-Bid
$7,547,059 est. value
Houston, TX

Hillridge Water Plant Improvements Phase II
Post-Bid
La Porte, TX

CY - Champ P.U.D. Lift Station Rehabilitation Project
Results
Less than $220,000 est. value
TX

Wastewater and Lift Station Improvements Phase III Project
Results
Less than $612,000 est. value
TX

Maintenance Service of Lift Station Pumps
Post-Bid
Houston, TX

Grease Trap and Lift Station Services
Results
Pasadena, TX

Informal - Sewer Lift Station Maintenance BCT
Post-Bid
La Porte, TX

Construction of Lift Station No. 4
Results
$614,000 est. value
TX

Rehabilitation Sewer Lift Station Jacinto Port
Post-Bid
Houston, TX

Copperfield Wastewater Treatment Plant Onsite Lift Station Rehabilitation
Results
$450,000 to $550,000 est. value
TX

Well Sites and Re-Pump Stations Improvements - Pkg I
Post-Bid
$6,743,850 est. value
Houston, TX 77000

Lake Houston Pump Station Discharge Piping Rehabilitation
Results
Highlands, TX

Fountain View Regional LS Construction and Abandonment of Westheimer No. 1 LS
Post-Bid
$21,957,065 est. value
Houston, TX

Lift Station Rehabilitation at Upper Braes WWTP
Results
$7,186,000 est. value
Houston, TX

Reported 05/06/2019 10:42 AM
Project Title

Lift Station No 2 Improvements

Physical Address View project details and contacts
City, State (County) Houston, TX 77039   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $513,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description The project scope includes, but is not limited to, replacement of two (2) existing dry-pit submersible pumps with two (2) horizontal self-priming pumps installed on a new concrete slab to be constructed above the existing dry-pit finished floor; construction of an extension of the top of the dry-pit walls above the base flood elevation; construction of a sump pump pit with sump pumps and discharge piping and valves within the dry-pit; replacement of the wet well manhole frame and cover, wet well vents, and dry-pit access ladder; demolition of the dry-pit top slab and access hatch and installation of safety grating over the dry-pit; 10-inch (10") diameter DIP force main piping from the new pumps to the existing force main piping; demolition and replacement of suction and discharge piping; header piping; associated valves, fittings and accessories; protective coatings; temporary bypass pumping system; replacement of chain link fencing; demolition and replacement of the lift station electrical service rack, control panel and terminal boxes, and level control equipment, including associated wires, conduits and electrical equipment; lighting; and all other associated electrical and site work specified or shown in the construction drawings and contract documents for a complete and operational system.
Details
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents