Similar Projects
Freshwater Mussel Survey and Aquatic Species Resource Relocation Services
Term Contract
Bidding
Waco, TX

Lake Granbury Two-Slip Floating Boathouse Replacement
Bidding
Granbury, TX 76048

Riverside Park Boat Ramp Improvements
Post-Bid
Bay City, TX 77414

Hazel Bazemore Park Boat Ramp Rehabilitation Project Phase II
Post-Bid
Corpus Christi, TX 78401

Aransas Boat Ramp Removal & Replace
Results
$95,000 to $105,000 est. value
TX

LAMR Add Slips to Dock at Sanford Yake
Results
Fritch, TX

Lake Houston Boat Ramp Replacement Services
Post-Bid
Houston, TX 77251

Aransas-Design/Build Boardwalk
Results
$250,000 to $500,000 est. value
TX

Keith Lake Boat Ramp Modification
Post-Bid
Beaumont, TX 77701

Anahuac-Boardwalk Renovation-Shoveler Pond
Results
$75,000 to $82,000 est. value
Anahuac, TX

Derelict Vessel Removal Services
Post-Bid
Austin, TX 78701

New Oil Dock 22 Marine Terminal
New Construction
Results
Corpus Christi, TX

Southeastern Freight Lines
Renovation
Post-Bid
El Paso, TX 79907

Lake Limestone Park 5 Loading Dock
Results
Waco, TX 76714

Construction Services for Perry R Bass Marine Fisheries Research Station
Post-Bid
Palacios, TX 77465

Reported 07/31/2020 12:00 AM
Project Title

Alabama Street Terminal Repairs - Phase II: Dock Fender Rehabilitation

Physical Address View project details and contacts
City, State (County) Orange, TX 77631   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all materials, equipment, tools, labor, supervision, services, and performing all operations in connection with the construction. The BID consists of installation of new timber pilings at discrete locations along the face of the wharves, forming new concrete pile caps to incorporate the new piles into the dock; repair existing concrete pile caps, and replacement of deteriorated fendering with new timber fendering along the face of the concrete wharves.

Details

Division 35 - Waterway and Marine Construction, Marine Specialties, Mooring Devices, Laser Docking Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents