Similar Projects
Cameron Park Drive Widening - Palmer Drive to Sudbury - 72143 - El Dorado County
Alteration
Conception
$6,047,000 est. value
Cameron Park, CA 95682

US 50 / Latrobe Road / El Dorado Hills Boulevard Interchange Improvements Phase 2B - 36104001 - El Dorado County
Infrastructure
Conception
$7,620,000 CJ est. value
Placerville, CA 95667

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Ponte Palermo Phase 2
New Construction, Infrastructure - 115,650 SF
Design
$15,000,000 CJ est. value
Cameron Park, CA 95682

Recreation and Aquatics Center - Phase 2
New Construction, Infrastructure
Bidding
South Lake Tahoe, CA 96150

DL Bliss State Park - Water Main
Infrastructure
Bidding
$2,150,000 CJ est. value
South Lake Tahoe, CA 96150

CHP Camino Platform Scales- Parking Lot Sweeping Services
Infrastructure
Post-Bid
Placerville, CA 95667

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Roadway Excavation Place Hot Mix Asphalt and Plastic Pipe
Infrastructure
Results
$870,000 est. value
CA

Hot Mix Asphalt (Hma) Concrete Grinder Dig Out Repair and Replacement Paving
Infrastructure
Results
Placerville, CA

The Landing at Tahoe Resort and Spa Cabins Addition
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
South Lake Tahoe, CA 96150

Sugar Pine Village
New Construction, Infrastructure
Pending Verification
$19,600,000 CJ est. value
South Lake Tahoe, CA 96150

Ice House Road Pavement Rehabilitation - Phase 3 - 36105068 - El Dorado County
Infrastructure
Conception
$2,533,000 CJ est. value
Kyburz, CA 95720

Bucks Bar Road at the North Fork Cosumnes River - Bridge Replacement - 77116 - El Dorado County
Demolition, New Construction, Infrastructure
Design
$10,388,000 CJ est. value
Placerville, CA 95667

Place Polyester Concrete Overlay
Infrastructure
Post-Bid
$1,650,000 est. value
CA

Last Updated 10/03/2022 04:06 PM
Project Title

Ice House Road Pavement Rehabilitation Phase 2 - 36105023 - El Dorado County

Physical Address View project details and contacts
City, State (County) Kyburz, CA 95720   (El Dorado County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $20,320,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The County is working with the Federal Highway Administration on design and construction for pavement rehabilitation of 17.57 miles of Ice House Road from PEAVINE RIDGE Road (MP 6.37) to the northern intersection of Wentworth Springs Road (MP 23.94). This project is included in the county's FY 2022-2042 Capital Improvement Program. As of October 3, 2022, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents