Similar Projects
US 12/Snake River Vaughn Hubbard Bridge EB - Bridge Painting
Infrastructure
Conception
$10,004,000 CJ est. value
Pasco, WA 99301

I-182/Over Railroad Bridge EB - Bridge Painting
Infrastructure
Conception
$1,733,000 CJ est. value
Pasco, WA 99301

US 12/Snake River Vaughn Hubbard Bridge EB - Repair Floor Beams
Infrastructure
Design
$1,016,000 CJ est. value
Pasco, WA 99301

I-182/Col R Lee-Volpentest Columbia River Bridge EB - Joint Repair
Infrastructure, Renovation
Design
$1,930,000 CJ est. value
Pasco, WA 99301

Panda Express / Pasco
New Construction, Infrastructure - 2,600 SF
Bidding
$500,000 CJ est. value
Pasco, WA 99301

RFQ-Design-Build Aquatics Facility Project
New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Pasco, WA 99301

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Darigold Plant
New Construction, Infrastructure - 400,000 SF
Construction
$600,000,000 CJ est. value
Pasco, WA 99301

Darigold Plant
New Construction, Infrastructure - 400,000 SF
Construction
$600,000,000 CJ est. value
Pasco, WA 99301

Civil Engineering Services for Argent Road Improvement - Phase 2 - City of Pasco
Infrastructure
Pending Verification
$20,000,000 CJ est. value
Pasco, WA 99301

Civil Engineering Services for Argent Road Improvement - Phase 2 - City of Pasco
Infrastructure
Pending Verification
$20,000,000 CJ est. value
Pasco, WA 99301

I-182/Yakima River RC Bremmer Bridges - Joint Repair
Infrastructure, Renovation
Design
$2,689,000 CJ est. value
Pasco, WA 99301

Last Updated 03/10/2023 01:03 PM
Project Title

Water Main Replacements - 2023

Physical Address View project details and contacts
City, State (County) Connell, WA 99326   (Franklin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $765,667 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Issuing Office for the Bidding Documents is: Anderson Perry & Associates, Inc., 214 East Birch Street, Walla Walla, Washington 99362, (509) 529-9260, Bill Vixie, P.E., bvixie@andersonperry.com. Project Category Code: Waterlines, Fittings and Valves, Water Utilities, Traffic Control, Construction, Excavation, Concrete Repair , Paving (Asphalt or Concrete) Description: The City of Connell, Washington (herein called the "Owner"), invites bids for the construction of the Water Main Replacements project. The work includes approximately 2,600 linear feet of 12-inch water line, 1,280 linear feet of 8-inch water line, 70 linear feet of 6-inch water line, hot mix asphalt for patching, curb, gutter and sidewalk restoration, water valves, fire hydrant, water service connections, and other associated work.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents