Similar Projects
Elevated Water Tank 1 Improvements
Infrastructure
Bidding
Flowery Branch, GA

Bloomingdale 400,000 Gallon Elevated Water Storage Tank
Post-Bid
Savannah, GA

Elevated Tank Rehabilitation
Renovation
Post-Bid
Georgetown, GA

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Westech Clarifier And Thickener Parts
Term Contract
Post-Bid
Atlanta, GA

Water Tank Removal
Results
Thomaston, GA 30286

Fairview Tank Exterior Painting
Post-Bid
Cartersville, Fairview, GA 30120

City Center Decorative Water Tank
Results
Less than $157,600 est. value
Cumming, GA

Solvent Tank Service
Term Contract
Post-Bid
Columbus, Fort Benning, GA 31905

Hendrix Road Tank Rehabilitation
Results
Less than $500,000 est. value
Cumming, GA 30040

As Needed Maintenance Forsyth County Water Towers
Term Contract
Post-Bid
GA

Rainey Road Tank 1 Reconditioning
Results
Less than $1,265,068 est. value
Carrollton, GA

Above Ground Storage Tank Internal Inspection
Term Contract
Post-Bid
Savannah, GA

South Cobb Water Reclamation Facility Chemical Tank Replacement
Results
Austell, Marietta, GA 30168

Reported 05/20/2022 12:00 AM
Project Title

Above Ground Pre-Stressed Concrete Tanks Insp/Rpr

Physical Address View project details and contacts
City, State (County) GA   (Gwinnett County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor must provide all supervision, labor, materials, tools, equipment, and incidentals required to complete the tank inspection, maintenance, repair, and rehabilitation work authorized under this contract. Work on the tanks may include the interior only, exterior only, or both interior and exterior. Work may also include inspection only, repair only, or both inspection and repair. Specific repairs will be those requested by DWR, based on separate inspections and recommendation reports. Work on multiple tanks at a single site shall be performed in a single mobilization.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents