Similar Projects
North Troy Air Handling Unit
Design
$250,000 to $500,000 est. value
North Troy, VT

Emergency Medical Service Station Retrofit Attic Air Seal and Insulation System
Alteration
Bidding
Barre, Websterville, VT 05641

Environmental Depot HVAC Scope
Alteration
Bidding
$20,000 est. value
South Burlington, VT 05403

Renovations of HVAC in Dormitory Buildings
Post-Bid
$1,000,000 to $5,000,000 est. value
Vergennes, VT 05491

Heating Contractors for Weatherization Assistance Program
Post-Bid

Wastewater Treatment Facility Digester Boiler Replacement
Results
Barre, VT 05641

Town Buildings HVAC
Term Contract
Results
Colchester, VT

Wright Hall Chiller Replacement
Post-Bid
Burlington, VT 05401

Police Department Ventilation System
Results
White River Junction, VT 05001

2020 Pellet Boiler Miller's Run Elementary School
Post-Bid
Sheffield, VT 05866

Hinesburg Community School Kitchen Ventilation Upgrade
Results
Hinesburg, VT 05461

Bugbee Senior Center Heat Pump System
Post-Bid
White River Junction, VT 05001

Inline Fan Install, Saint Albans Federal Building, Saint Albans, Vt
Results
Saint Albans, VT 05478

Hartford Police Department Heat Pump System
Post-Bid
White River Junction, VT 05001

Hinesburg Community School 2nd Floor Dehumidification
Results
Hinesburg, VT 05461

Reported 06/24/2021 04:05 PM
Project Title

Replacement of Community Building Boiler

Physical Address View project details and contacts
City, State (County) East Haven, VT 05837   (Essex County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of the 500,000 BTUs/HR cast iron oil fired boiler. OPTION #1: Removal of the current cast iron oil fired boiler and replace with a new oil fired boiler of sufficient size. OPTION #2: Removal of the current cast iron oil fired boiler and replace with sufficient sized propane fired boiler with all necessary work to convert to propane, including propane tank. This project must be completed by September 15, 2021.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents