Similar Projects
Garco and Empire Streetscape Plan
Post-Bid
North Charleston, SC

Carta Melnick Park and Ride Facility
Post-Bid
North Charleston, SC

Grand Concourse Sidewalk Connection TST
Results
North Charleston, SC 29405

On-Call Sidewalk Repair-Charleston
Results
SC

CDBG FY 16/17 and 17/18 Sidewalk Improvements
Post-Bid
North Charleston, SC

Lansing Drive Sidewalk Installation CTC
Results
North Charleston, SC

Seal and Re-Strip Parking Lot
Post-Bid
Charleston, SC 29409

Markfield Drive Sidewalk Installation TST
Results
North Charleston, SC

Bay Creek Park Parking Lot Improvements
Post-Bid
$15,000 to $30,000 est. value
Edisto Island, SC 29438

Quail Drive Sidewalk Installation TST
Results
SC

Zucker GEC Parking Lot - Resurface
Post-Bid
$125,000 to $140,000 est. value
North Charleston, SC 29634

On-Call Trip Hazard Repair-Chalreston
Term Contract
Results
SC

St. Julian Devine Community Center Site Improvements
Post-Bid
Charleston, SC 29403

Orleans Road Sidewalk Installation TST
Results
Saint Andrews, SC 29407

Oakbrook Middle School Bus Parking Lot
Post-Bid
$150,000 to $250,000 est. value
Ladson, SC 29456

Last Updated 03/05/2019 03:08 PM
Project Title

Dills Bluff Sidewalk Project - Phase 2

Physical Address View project details and contacts
City, State (County) James Island, SC   (Charleston County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Includes connecting a gravel path to an existing concrete sidewalk, clearing the right of way as required to install the sidewalk, filling low areas in the path, constructing an approximate 300 foot gravel path, selective clearing of the area along where the gravel path will be, constructing an approximate 190 foot wooden elevated boardwalk over a marsh, pouring concrete tie-ins for the wooden boardwalk, driving boardwalk piles, pouring a concrete sidewalk stub at the termination of the boardwalk, extending an existing concrete drain pipe and extending the asphalt path to the concrete tie-in.
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents