Similar Projects
Public Housing Heat Pump Replacements
Bidding
Chandler, AZ

Phoenix Indian Medical Center Cooling Tower Fill
Bidding
Phoenix, AZ

Shepherd Junior High Cooling Tower Repairs
Term Contract
Post-Bid
Mesa, AZ 85205

Franklin at Brimhall Junior High Cooling Tower Repairs
Term Contract
Post-Bid
Mesa, AZ 85210

SFB Washington Central Plant Parts and Repairs
Results
Phoenix, AZ 85301

Preventive Maintenance and Repair of Screw Chillers
Results
Mesa, AZ 85210

Metal Registers, Grilles and Diffusers
Bidding
Phoenix, AZ 85016

Kino Junior High Cooling Tower Repairs
Term Contract
Post-Bid
Mesa, AZ 85203

Air Handler Units (AHUs) Replacement
Results
Phoenix, AZ

Pomeroy Elementary Cooling Tower Repairs
Post-Bid
Chandler, AZ 85224

MCDOT HVAC Upgrades
Results
Less than $3,221,967 est. value
AZ

Mesa Center For Success At Jordan Cooling Tower Repairs
Post-Bid
Chandler, AZ

Western Region - HVAC Services
Results
Phoenix, AZ

Ishikawa Elementary Cooling Tower Repairs
Term Contract
Post-Bid
Mesa, AZ 85213

1700 West Washington Executive Tower AHUS Replacement
Results
Phoenix, AZ

Reported 02/23/2021 12:00 AM
Project Title

Compressor Replacement

Physical Address View project details and contacts
City, State (County) Phoenix, AZ   (Maricopa County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replace the compressor section of system number 3, since this is where the leaks in this system have been. The main component has been the refrigerant accumulator tank, it was first brazed in 2019, it was replaced in 2020 with a new tank. Next, a pinhole leak developed which we lost all of the oil and all of the refrigerant. The compressor failed next and was replaced. Lastly the newly placed tank developed a leak, this was brazed, but given the 1 year time lapse before the first one failed, we became concerned that we were just patching a damaged system. This will replace the entire compressor system with a new system put together from the factory with a limited warranty and a renewed compressor warranty. The objective of this contract is to replace the compressor section of system number 3 of the Mitsubishi variable refrigerant system. System Requirements: The system will need a PURY-P144YNU-A for a replacement, a 460 V, 3 phase, 60 Hz.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents