Similar Projects
Existing Pre-K, Elementary, Middle and High Schools Renovations & Additions
Renovation, Addition - 27,100 SF
Conception
Cadet, MO 63630

Heritage Intermediate & Elementary School Renovation
Renovation
Conception
Wentzville, MO 63385

High School Library
Renovation - 10,000 SF
Design
$1,500,000 est. value
Clayton, MO 63105

Construct an ADA Compliant Ramp and Entrance
Renovation
Design
$100,000 est. value
Chamois, MO

Congress Middle School 2021
Renovation
Post-Bid
Kansas City, MO

Monett Middle School, Security Upgrades and Improvements
Renovation
Post-Bid
Monett, MO 65708

Kirkwood High School (KHS) Security Office Renovations Project 2021
Renovation
Results
Kirkwood, MO 63122

Waynesville MS Phase III - Parker Fine Arts Building
Renovation, Addition
Results
Waynesville, MO 65583

District-Wide Building Automation System Modernization Project
Renovation
Design
$1,500,000 est. value
Byrnes Mill, MO 63025

South County Technical High Schools Additions and Alterations
Renovation
Post-Bid
$6,000,000 to $8,000,000 est. value
Saint Louis, MO 63127

Jefferson Middle School
Renovation, Addition
Results
Columbia, MO 65201

Platte County High School Rebuild
New Construction
Post-Bid
Platte City, MO 64079

Holcomb R-3 FEMA Safe Room
New Construction
Results
Holcomb, MO 63852

Affton High School Field
Renovation
Post-Bid
Saint Louis, MO 63123

Carthage North Technical Center
Renovation
Results
Carthage, MO 64836

Last Updated 11/29/2022 09:09 AM
Project Title

Willard Central Elementary Safe Room & Classroom Addition Bid Package A

Physical Address View project details and contacts
City, State (County) Willard, MO 65781   (Greene County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,561,209 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: renovation of a 20,167 square foot educational facility. As of November 28, 2022, a general contractor has not yet been selected for this project not yet been released. A firm construction timeline has not yet been released.

Details

20,167 SF.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents