Similar Projects
Chemical Treatment Services for Cooling Towers
Term Contract
Results
TX

HVAC/MEP Package 1
Results
$5,832,870 est. value
Missouri City, TX 77459

PKG023 HVAC Controls
Post-Bid
$3,015,700 est. value
Sugar Land, TX 77498

Contingency Restoration Services for Emergency Disasters
Results
TX

HVAC Replacement for Fort Bend County Fairgrounds, Building B
Results
Rosenberg, TX 77471

Preventive Maintenance, Inspection, and Repair Services of Chilled Water Systems and Associated Equi
Post-Bid

HVAC Maintenance for Libraries
Term Contract
Results
TX

HVAC MEP
Post-Bid
Sugar Land, TX

Facility Maintenance and Repair to Include HVAC, Electrical and Plumbing Services
Term Contract
Post-Bid

HVAC/MEP Package A1 Multiple Campuses
Results
Less than $6,104,000 est. value
TX

HVAC/MEP 2A Replacements at Multiple Campuses
Results
$7,541,691 est. value
Sugar Land, TX 77498

Term Contract for Preventative Maintenance for specific HVAC Systems
Term Contract
Results
Missouri City, TX

HVAC Replacement for Fort Bend County Office of Emergency Management
Results
Richmond, TX

Sienna Annex Chiller Replacement Project
Results
Missouri City, TX 77459

HVAC/MEP 4 Replacements at Multiple Campuses
Results
$4,188,965 est. value
Sugar Land, TX 77479

Reported 04/17/2019 12:00 AM
Project Title

Testing, Adjusting and Balancing(Tab) for HVAC Services

Physical Address View project details and contacts
City, State (County) Stafford, TX 77477   (Fort Bend County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Middle School: New construction. Three-story structure. Approximately 127,200 square feet. The budget for construction is approximately $27,920,000. 2. Administration Building: New construction. Two-story structure. Approximately 26,387 square feet. The budget for construction is approximately $5,930,000.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents