Similar Projects
Murphy USA #7206/7851 / Glasgow
Demolition, New Construction, Infrastructure - 208 SF
Conception
$1,500,000 CJ est. value
Glasgow, KY 42141

Old Schoolhouse Lane Subdivision
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
Lexington, KY 40513

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

Langley Bullock Industrial Development / Hebron
New Construction, Infrastructure - 230,000 SF
Design
$123,510,000 CJ est. value
Hebron, KY 41048

Playworks Event Building & Restroom Building, Waterfront Development Corp., Phase IV
New Construction, Infrastructure
Bidding
$50,000,000 CJ est. value
Louisville, KY 40202

Weaver Road (KY 842) Sidewalk
Infrastructure
Bidding
$1,800,000 CJ est. value
Florence, KY 41042

Piling/Drilling
Infrastructure
Post-Bid
Catlettsburg, KY

Waterline Extensions Contract 2 - Tank Rehab
Infrastructure
Post-Bid
Jackson, KY

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Murray-Calloway County Hospital Re-Roofing
Renovation
Construction
Murray, KY 42071

Blackburn Avenue Multi-Residential Development
New Construction, Infrastructure - 24,816 SF
Pending Verification
$6,000,000 CJ est. value
Lexington, KY 40508

Beaumont Middle School - Fayette County Board of Education
Renovation, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Lexington, KY 40504

Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
$10,660,000 CJ est. value
Glasgow, KY 42141

Welding Alloys Storage Building
New Construction, Infrastructure - 16,000 SF
Design
$1,700,000 CJ est. value
Florence, KY 41042

Last Updated 09/27/2022 01:44 AM
Project Title

New 2.0 MG Elevated Water Storage Tank

Physical Address View project details and contacts
City, State (County) Henderson, KY 42420   (Henderson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $5,460,700 [brand] Estimate
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

One composite style 2.0 MG elevated water storage tank o All associated piping o All electrical work o Site work The allotted time for construction of Contract 22-02 is 480 calendar days. Liquidated damages for non-completion are $1,000 per calendar day. The CONTRACT DOCUMENTS may be examined at the following locations: Henderson Water Utility, 111 Fifth Street, Henderson, KY 42420 and J. R. Wauford & Company, Consulting Engineers, Inc., 2835 Lebanon Pike, Nashville, TN 37214. Please contact QuestCDN at 952-233-1632 or info@questcdn.com for assistance in free membership registration, downloading, and working with the digital project information. Inquiries should be directed to the project manager, Stephen C. Lee, P.E., (615) 883-3243, stephenl@jrwauford.com. Bid bond, City Occupational License, and other requirements apply to bidders. The Owner reserves the right to reject any and all bids, to waive informalities, and to negotiate with the apparent qualified best bidder or bidders to such extent as may be necessary. No bidder may withdraw his bid for 90 days, while the Owner considers the bids. Mutually agreed upon time extensions may be made if necessary. Est. Value:$ 5,500,000.00 General contractors shall meet the following pre-qualification requirements to be eligible to bid on this contract: 1. Pre-qualification information required herein shall be emailed to stephenl@jrwauford.com on or before Friday, March 25, 2022. Prospective bidders are responsible for confirming receipt of pre-qualification information by calling 615-883-3243. The prospective bidder shall provide evidence of general ability to perform similar work in a timely manner by submitting the project name, scope of work, allowed and actual time of completion, and a contact person for three previous projects of this general nature constructed within the past ten (10) years. Alternatively, the prospective bidder shall list previous, specific experience on projects completed for the Henderson Water Utility in the past ten (10) years. After registering, you will receive a confirmation email including the information required to join the meeting. If you do not receive the confirmation email, please check your spam folder. Project value: $5 to $6 million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents