Similar Projects
New Water Treatment System
Term Contract, Alteration
Design
$25,000 to $100,000 est. value
Waldport, OR

Water Filtration System
Renovation
Bidding
$600,000 CJ est. value
Woodburn, OR 97071

Eugene Street Water and Wastewater Replacement Project
Infrastructure
Bidding
$1,460,000 CJ est. value
Hood River, OR 97031

Cascade Well No. 10 Drywell Installation
Infrastructure
Sub-Bidding
$129,880 CJ est. value
Gresham, OR 97030

750,000 Gallon Reservoir #2
New Construction, Infrastructure
Sub-Bidding
$1,200,000 CJ est. value
Sublimity, OR 97385

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

CB2 at Brewery Blocks 2 Building
Alteration
Post-Bid
Portland, OR

Diamond Lake Rescue Building
New Construction, Alteration
Results
Roseburg, OR

Commercial Plumbing Service
Alteration
Results
OR

On-Call Trade Services for Prevailing Wage Projects
Term Contract
Post-Bid
OR

Tri-City Water Resource Recovery Facility ("WRRF") Fill Removal
Infrastructure
Results
$662,500 CJ est. value
Oregon City, OR 97045

On-Call Repair and Maintenance Services Retainer Contract
Alteration
Post-Bid
Eugene, OR

Philomath Water Treatment Plant Improvements, Phase I
Infrastructure
Results
$4,161,000 CJ est. value
Philomath, OR 97370

Plumbing Supplies - EOCI
Term Contract
Post-Bid
Umatilla, OR 97882

Water System Improvements - Phase II - Collector Well No. 3 Pump Station, Booster Pump Station and 1 Million Gallon Reservoir
Infrastructure
Results
$10,207,115 CJ est. value
Boardman, OR 97818

Last Updated 05/12/2023 01:35 PM
Project Title

Horn Creek Channel Improvements

Physical Address View project details and contacts
City, State (County) Central Point, OR 97502   (Jackson County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A. Summarize the overall project including work in areas both in and outside of waters or wetlands. The project site is a portion of Horn Creek. Within the project site, the creek is in a culvert for approximately 100 ft. There is an overflow (high flow) bypass channel to the west of the culvert. This project will reestablish the creek channel in the bypass channel footprint and abandon the culvert. The culvert will remain in place but be plugged on both ends. The re-established channel will be sized appropriately to function in low and high flow scenarios. B. Describe work within waters and wetlands. The project area has two sections of a water way (one above and one below the culvert). The work will be conducted in the bypass portion of the water way (temporary impacts) to resize the channel. Presently, the stream above and below the project area is incised and restricted by steep slopes. The channel will be widened to allow a riparian bench at the north and south ends of the culvert, as much as the incision and area restriction allows. Additional work (permanent impacts) will occur in the waterways at each end of the culvert to plug the culvert. Please direct all questions to Greg Graves at 541-664-3321 (x225) or greg.graves@ centralpoint.gov. The deadline for questions is May 5, 2023 Project Category Code: Erosion Control/Slope, Bank Stabilization, Traffic Control, Stormwater Improvements, Culverts, Waterways, Stormwater Channels, Grubbing & Clearing, Excavation, Drainage, Dredging, Ditches and Canals Description: This project consists of approximately 210 linear feet of stream restoration work within Horn Creek. 1. Implement temporary traffic control 2. Implement erosion and sediment control measures 3. Clearing and grubbing 4. Abandonment of Existing Culvert 5. Excavation, Grading, and Backfill 6. Install Rip Rap Slope Protection 7. Planting and Seeding 8. Perform additional and incidental work as called for by the Specifications and Plans. Site Directions: Horn Creek, Central Point, Oregon, between Mendolia Way and Donna Way COST ESTIMATE: $100,000 - $150,000

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents