Similar Projects
Contractor - HVAC Repairs
Alteration
Design
$250,000 to $500,000 est. value
Westhampton Beach, NY 11978

Brentwood Fire District - New Sub Station - Mechanical Construction
New Construction, Infrastructure
Sub-Bidding
$500,000 CJ est. value
Bay Shore, NY 11706

HVAC Work Replace HVAC System Building No. 26 Pilgrim Psychiatric Center
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Brentwood, NY 11717

Hvac Equipment Maintenance And Related Services
Term Contract
Post-Bid

HVAC System Replacement
Alteration
Post-Bid
Holbrook, NY 11741

Building Automation System Repairs (Hvac)
Alteration
Results
$250,000 to $500,000 est. value
Shoreham, NY 11786

Cooling Tower Maintenance and Water Treatment
Term Contract
Results
Stony Brook, NY

Cogeneration Systems Preventive Maintenance And Repair
Term Contract
Post-Bid
Deer Park, NY 11729

HVAC Mechanical Upgrades Phase 2
Alteration
Results
Patchogue, NY 11772

Repair of Boat House Furnace
Term Contract
Post-Bid
Babylon, NY 11702

Auditorium at East Islip Middle School
Alteration
Results
Islip Terrace, NY 11752

South Ocean MS Unit Ventilator Reconstruction
Renovation, Alteration
Post-Bid
$1,750,000 est. value
Patchogue, NY 11772

Replace Heating System
Alteration
Results
$500,000 to $1,000,000 est. value
Babylon, NY 11702

HVAC Repair and Maintenance
Alteration
Post-Bid
Islandia, NY 11749

On-Call Landfill Administration Buildings HVAC System Maintenance
Term Contract
Results
Yaphank, NY 11980

Last Updated 05/01/2023 06:02 PM
Project Title

Interior Renovations and Mechanical Scope at Eastport Elementary-Mechanical

Physical Address View project details and contacts
City, State (County) Eastport, NY 11941   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,094,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Non-bidders shall receive partial reimbursement, in an amount equal to the amount ofthe deposit, less the actu - al cost of reproduction of the docu - ments if the set is returned in good condition within thirty (30) days following the award of the contract or the rejection of the bids covered by such plans and specifications. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all pack - aging and shipping costs. Please note REVplans (melville. h2mplanroom.com ) is the designat - ed location and means for distrib - uting and obtaining all bid package information. Only those Contract Documents obtained in this manner will enable a prospective bidder to be identified as an official plan hold - er of record. The Provider takes no responsibility for the completeness of Contract Documents obtained from other sources. Contract Docu - ments obtained from other sources may not be accurate or may not contain addenda thatmay have been issued. All bid addenda will be transmitted to registered plan holders via email and will be available at melville. h2mplanroom.com. Plan holders who have paid for hard copies ofthe bid documents will need to make the determination if hard copies of the addenda are required for their use and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies ofthe bid addenda Each proposal submitted must be accompanied by a certified check or bid bond, made payable to the "EASTPORT-SOUTH MANOR CENTRAL SCHOOL DISTRICT", in an amount equal to ten percent (10%) of the total amount of the bid, as a commitment by the bidder that, if its bid is accepted, it will enter into a contract to perform the work and will execute such furthersecurity as may be required for the faithful per - formance of the contract. CERTIFI - CATION OF BONDING COMPANY IS REQUIRED FOR THIS BID, SEE INSTRUCTIONS FOR BIDDERS. Each bidder shall agree to hold his/ her bid price for forty-five (45) days after the formal bid opening. It is the Board ' s intention to award the contract to the lowest qualified bidder in compliance with the spec - ifications providing the required security who can meet the experi - ence, technical and budget require - ments. The Board reserves the right to reject any or all bids, waive any informality and to accept such bid J which, in the opinion of the Board, is in the best interests ofthe School * District.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents