Similar Projects
Last Updated | 12/22/2020 03:39 PM |
Project Title | Advanced Munitions Technology Complex PH II FTFA 043000, Eglin Air Force Base, Florida |
Physical Address | View project details and contacts |
City, State (County) | Eglin AFB, FL 32542 (Okaloosa County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $25,000,000 to $100,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Description of Work: This work involves the construction of new bunkers. They are all one story in height. Personnel access the bunkers during hands-on operations, cleaning and when materials are loaded and removed from the space. All equipment in the bunkers is operated remotely from the control room in the staging building. The sf of the facilities is two (2) bunkers at 484 sf each and four (4) bunkers at 495 sf each. The bunkers will be reinforced concrete structures covered with earth overburden. The vertical surfaces of the earth covered concrete will be protected by a fluid applied waterproof membrane covered by a drainage mat / protection board with filter fabric. Exposed concrete shall be sealed. The Complex for Agile Processing of Energetics, Explosive Machining (CAPE) will also be constructed as a new part of the Advanced Munitions Technology Complex at the High Explosives Research and Development (HERD) sector at Eglin AFB. The CAPE Explosive Machining facility contains the three explosive machining bunkers and the staging building for the equipment in the energetics processing and machining bunkers. The building is separated from the explosive operations contained in the bunkers. The buildings are one story facilities. Approximately 4 - 6 full time personnel occupy the building from 0800 to 1700 hours. Personnel access the bunkers during hands-on operations, cleaning and when materials are loaded and removed from the space. All equipment in the bunkers is operated remotely from the control room in the staging building. The facility is 4,035 sf. |
||||||||||||||||||||||||||||||||||||
Details | ,, 979 SF - 2 Military Facility, 484 SF New Construction, 4 Military Facility, 495 SF New Construction.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |