Similar Projects
Design-Build and Design-Bid-Build Indefinite-Delivery/Indefinite Quantity Multiple Award Construction Contract for Jacksonville/Mayport/Orlando Areas N69450-20-R-0012
New Construction, Renovation, Demolition
Design
$150,000 to $99,000,000 est. value
Jacksonville, Mayport, Orlando, FL

Design-Build and Design-Bid-Build Indefinite-Delivery/Indefinite Quantity Multiple Award Construction Contract for Jacksonville/Mayport/Orlando Areas N69450-20-R-0012
New Construction, Renovation, Demolition
Design
$150,000 to $99,000,000 est. value
Jacksonville, Mayport, Orlando, FL

Airey and Tyndall Gate Complexes, Tyndall AFB, Florida
Post-Bid
$25,000,000 to $100,000,000 est. value
Panama City, FL 32403

Army Reserve Center in Panama City, Florida
Addition - 5,532 SF
Post-Bid
$1,000,000 to $5,000,000 est. value
Panama City, FL

Z--Base Operations Support(BOS)Services at Whiting Field, FL
Results
$10,000,000 to $20,000,000 est. value
Whiting Field, FL

Z--Base Operations Support(BOS)Services at Whiting Field, FL
Results
$10,000,000 to $20,000,000 est. value
Whiting Field, FL

Long-Range Stand-Off Acquisition Facility Eglin AFB, FL
New Construction - 49,370 SF
Construction
$25,000,000 to $100,000,000 est. value
Eglin AFB, FL 32542

Repair Command Post, Bldg 90208
Construction
$1,000,000 to $5,000,000 est. value
Hurlburt Field, FL 32544

Two-Phase Design and Construction of Munition Storage Facilities, Tyndall AFB, FL
Design
$10,000,000 to $25,000,000 est. value
Panama City, FL

(Idiq) (Satoc) For Design-Build and Construction, Continental United States (Conus) Projects Related To General Construction
Post-Bid
$1,000,000 to $3,000,000 est. value
Moore Haven, Port Mayaca, FL

Modify Control Rooms Building 380
Renovation
Results
$5,000,000 to $10,000,000 est. value
Eglin AFB, FL 32542

KC-135 Beddown Add Flight Simulator Training, Macdill AFB, FL (Hillsborough County)
Renovation, Addition - 5,338 SF
Construction
Tampa, FL

Design-Build and Design-Bid-Build Indefinite-Delivery Indefinite-Quantity Multiple Award Construction Contract for Naval Facilities Engineering Command Southeast Area of Operations N69450-20-R-0097
Design
$20,000,000 to $100,000,000 est. value

NAVFAC Intermodal Staging Area Repairs
Post-Bid
Jacksonville, FL 32226

Tyndall AFB, FL- Upgrade WEG Sub-scale Drone Facilities
Results
$500,000 to $1,000,000 est. value
Panama City, FL

Last Updated 12/22/2020 03:39 PM
Project Title

Advanced Munitions Technology Complex PH II FTFA 043000, Eglin Air Force Base, Florida

Physical Address View project details and contacts
City, State (County) Eglin AFB, FL 32542   (Okaloosa County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000,000 to $100,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Description of Work: This work involves the construction of new bunkers. They are all one story in height. Personnel access the bunkers during hands-on operations, cleaning and when materials are loaded and removed from the space. All equipment in the bunkers is operated remotely from the control room in the staging building. The sf of the facilities is two (2) bunkers at 484 sf each and four (4) bunkers at 495 sf each. The bunkers will be reinforced concrete structures covered with earth overburden. The vertical surfaces of the earth covered concrete will be protected by a fluid applied waterproof membrane covered by a drainage mat / protection board with filter fabric. Exposed concrete shall be sealed. The Complex for Agile Processing of Energetics, Explosive Machining (CAPE) will also be constructed as a new part of the Advanced Munitions Technology Complex at the High Explosives Research and Development (HERD) sector at Eglin AFB. The CAPE Explosive Machining facility contains the three explosive machining bunkers and the staging building for the equipment in the energetics processing and machining bunkers. The building is separated from the explosive operations contained in the bunkers. The buildings are one story facilities. Approximately 4 - 6 full time personnel occupy the building from 0800 to 1700 hours. Personnel access the bunkers during hands-on operations, cleaning and when materials are loaded and removed from the space. All equipment in the bunkers is operated remotely from the control room in the staging building. The facility is 4,035 sf.

Details

,, 979 SF - 2 Military Facility, 484 SF New Construction, 4 Military Facility, 495 SF New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents