Similar Projects
Downtown Streetscape and Utility Improvements, Phase II
Post-Bid
Gainesville, GA 30501

Parking Lot and Trailhead
Post-Bid
Sandersville, GA

Parking Lot Resurfacing Repair of the Welcome Center Parking Lot
Results
Lincolnton, GA 30817

GC Services for Peachtree MS Site Access Improvements
Results
Less than $1,000,000 est. value
Atlanta, Dunwoody, GA 30338

Amazon Parking Lot Expansion
Construction
Smyrna, GA

Cedar Walk Apartments
Post-Bid
Hinesville, GA 31313

Kennesaw Avenue Sidewalk and Drainage Improvements
Results
$350,000 to $500,000 est. value
Nelson, GA

K-12 New Parking Lot
Post-Bid
GA

2019 Parking Lot Rehabilitation
Results
Clarkesville, GA 30523

Concrete Walkway - Governors Drive
Post-Bid
Forest Park, GA 30297

Construction of Streetscape and Atlanta Highway Sidewalk Phase II
Term Contract
Results
Bogart, GA 30622

Blakely Gateway Project
Post-Bid
Less than $800,000 est. value
Blakely, GA 31723

Parking Lot at Tom Pittman Field
Results
Aragon, GA 30104

Cumming City Center, FCHS Parking Lot
Post-Bid
Cumming, GA 30040

Davis Road Sidewalks
Results
Stockbridge, GA 30281

Last Updated 02/28/2020 03:20 PM
Project Title

Dewar Elementary School Drive Way

Physical Address View project details and contacts
City, State (County) Valdosta, GA 31605   (Lowndes County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New drive way leading from Howell Lane into Dewar Elementary School. This drive will be for the purpose of student drop off and pick up for those students who are car riders. Coordinate survey and route to Dewar Elementary Campus through newly acquired property. Install construction fencing and erosion control measures as required. Perform all clearing and grubbing. Coordinate and install drainage to provide proper drainage of property. Install 22 foot wide drive with 6” aggregate base and 1-1/2 inch Superpave Asphalt Surface from Howell Lane to where drop off loop begins. (See Image). Install 12 foot wide drive with 6” aggregate base and 1-1/2 inch Superpave Asphalt Surface in the drop off loop. (See Image). Hydroseed all disturbed areas.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents