Similar Projects
Sugnet and Main Sewer Improvement - City of Midland
Infrastructure
Conception
$723,808 est. value
Midland, MI 48640

Streambank Stabilization - Middle Rouge River (along Rotary Park) - 093-10 - City of Novi
Infrastructure
Conception
$599,550 est. value
Novi, MI

Construct Main Gate
Infrastructure, Alteration
Design
$5,000,000 to $10,000,000 est. value
Battle Creek, MI 49037

Lake Street, Roadway and Utility Improvements
Infrastructure
Bidding
$600,000 est. value
Kalamazoo, MI 49001

Bement Drain
Infrastructure
Bidding
$200,000 est. value
Saginaw, MI

Slope Restoration
Term Contract
Post-Bid
Clinton, MI

Storm/Sanitary Drain Piping Replacement
Post-Bid
$1,000,000 to $3,000,000 est. value
Detroit, MI

Fish Dam Creek Crossing - Bridge/ Culvert
Results
MI

Storage Lagoon 4 Liner Repair
Results
Hart, MI

7346 - Wealthy Street Ethel Avenue to Woodmere Avenue - Water Replacement - TEMP20106 - City of Grand Rapids
Infrastructure
Conception
$420,000 est. value
Grand Rapids, MI 49525

City of Hancock Maasto Hiihto Trail Repairs
Renovation, Infrastructure
Bidding
$400,000 est. value
Hancock, MI

Rochester High School Storm Drainage Projects
Post-Bid
Rochester Hills, MI 48309

Single Span Timber Bridge-Schmallers Road
Results
Atlanta, MI

South Final Tanks - TEMP22098 - City of Grand Rapids
Infrastructure
Conception
$500,000 est. value
Grand Rapids, MI 49503

2022 Roadway Improvements Crushing and HMA Overlay
Infrastructure
Bidding
$700,000 est. value
MI

Reported 07/19/2022 12:00 AM
Project Title

Trail Drainage Improvements

Physical Address View project details and contacts
City, State (County) Hancock, MI 49930   (Houghton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of drainage improvements along the all season trail including, 207 feet of storm sewer installation, storm structure installation, removal of the existing trail surface, riprap installation, associated concrete work, HMA paving, and restoration.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents