Similar Projects
NYSDEC Field Office and Maintenance Building - Design-Build Services
- 3,400 SF
Construction
NY 13662

St. Lawrence County Highway Garage and Salt Storage Buildings
Construction
Canton, NY

St. Lawrence County Highway Department New Russell Salt Storage Building
Construction
Canton, NY

Massena Pipe Storage Building
New Construction - 5,000 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Massena, NY 13662

New Potsdam Highway Garage and Salt Storage Building
New Construction - 14,400 SF
Results
Potsdam, NY 13676

Electrical Work Provide Salt Storage Building - Cranberry Lake
New Construction, Infrastructure
Post-Bid
$100,000 CJ est. value
Cranberry Lake, NY 12927

Electrical Work Provide Salt Storage Building - Cranberry Lake
New Construction, Infrastructure
Post-Bid
$100,000 CJ est. value
Cranberry Lake, NY 12927

Sidewalk Improvements - Phase 2
Infrastructure
Results
$600,000 CJ est. value
Norfolk, NY 13667

Ogdensburg Transfer Station Improvements
New Construction, Renovation, Infrastructure
Post-Bid
$600,000 CJ est. value
Ogdensburg, NY 13669

Ogdensburg Transfer Station Improvements
New Construction, Renovation, Infrastructure
Post-Bid
$600,000 CJ est. value
Ogdensburg, NY 13669

Marine Base and Maintenance Building Paving
Infrastructure
Post-Bid
$250,000 CJ est. value
Massena, NY 13662

St. Lawrence Addiction Treatment Center Phase VII Repairs and Asbestos Abatement
Addition, Term Contract, Demolition, Renovation, Infrastructure
Bidding
$1,500,000 CJ est. value
Ogdensburg, NY 13669

Massena airport rehabilitating entire main runway
Infrastructure
Design
Massena, NY 13662

Eisenhower Diffuser Pit Shotcrete Construction
Infrastructure
Design
$1,000,000 CJ est. value
Massena, NY 13662

Rehabilitation of Skate Creek Road Bridge Components over Oswegatchie River
Infrastructure
Bidding
$966,000 CJ est. value
Oswegatchie, NY 13670

Last Updated 10/05/2022 04:12 PM
Project Title

Provide Salt Storage Building- Cranberry Lake - Construction Work

Physical Address View project details and contacts
City, State (County) Cranberry Lake, NY 12927   (Saint Lawrence County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Provide Salt Storage Building- Cranberry Lake - Construction Work Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by a bid security (i.e. certified check, bank check, or bid bond in the amount of $32,700 for C and $7,700 for E). MBE Goals: C Trade: 5% E Trade: 0% WBE Goals: C Trade: 5% E Trade: 0% SDVOB Goals: C Trade: 3% E Trade: 0% All successful bidders will be required to furnish a Performance Bond and a Labor and Material Bond pursuant to Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract estimated to be between $500,000 and $1,000,000 for C and between $50,000 and $100,000 for E. Pursuant to Public Buildings Law 8(6), effective January 11, 2020, for any projects where the project design commenced on or after January 1, 2020 and for any contracts over $5,000 for the work of construction, reconstruction, alteration, repair, or improvement of any State building, a responsible and reliable NYS-certified Minority or Women-Owned Business Enterprise that submits a bid within ten percent of the lowest bid will be deemed the apparent low bidder provided that the bid is $1,400,000 or less, as adjusted annually for inflation beginning January 1, 2020. If more than one responsible and reliable MWBE firm meets these requirements, the MWBE firm with the lowest bid will be deemed the apparent low bidder. Phone the office of Megan Miller (315-960-1229) a minimum of 48 hours in advance of the date to provide the names of those who will attend the pre-bid site visit. Only contractors that schedule a visit at least 48 hours in advance will be allowed to participate in the pre-bid site visit. The substantial completion date for this project is 167 days after the Agreement is approved by the Comptroller. The Office of General Services reserves the right to reject any or all bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents