Similar Projects
Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

Panera Bread / Roseville
New Construction, Infrastructure - 4,150 SF
Conception
$1,300,000 CJ est. value
Roseville, MN 55113

Crystal Community Center Parking Lot and Bassett Creek Dog Park
Infrastructure
Design
$2,079,215 CJ est. value
Crystal, MN 55422

Agricultural Lab Building Infrastructure Improvements
Renovation, Alteration
Post-Bid
$19,126,000 est. value
Saint Paul, MN 55155

Agricultural Lab Building Infrastructure Improvements
Renovation, Alteration
Post-Bid
$19,126,000 est. value
Saint Paul, MN 55155

Regional Drinking Water Project Contract A - Wells 7 and 8 Construction
Renovation - 156,816 SF
Results
Cloquet, MN 55720

2021 Site Improvements
Results
Monticello, MN 55362

Quarter Lake West Apartments Phase I
New Construction
Construction
$224,000,000 est. value
Minneapolis, MN 55416

Orchard Place Retail Center
Addition - 24,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Apple Valley, MN 55124

Vermillion Acres Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Hastings, MN 55033

Block 25 Lofts
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Willmar, MN 56201

Scientific Drilling Operations
Infrastructure
Post-Bid
Soudan, MN 55782

Electrokinetics Pilot Test Design and Installation, Winona Groundwater Site
Results
$190,000 est. value
Winona, MN 55987

Siegle Property Housing Development
New Construction
Construction
Waconia, MN 55387

Zentih Tiny Home Neighborhood
New Construction, Infrastructure - 19,250 SF
Pending Verification
Duluth, MN 55806

Last Updated 11/01/2022 10:02 AM
Project Title

Madelia Mobile Village Infrastructure Improvement Project

Physical Address View project details and contacts
City, State (County) Madelia, MN 56062   (Watonwan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $245,269 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 1, 2022, the project is pending award. A timeline for award has not been confirmed. The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: 1,026 L F 2" WATERMAIN HDPE (DIRECTIONAL DRILLED) 20 EACH CONNECT TO EXISTING WATER SERVICE 1,168 L F 6" HDPE PIPE SEWER-PIPE BURSTING 20 EACH CONNECT TO EXISTING SANITARY SEWER SERVICE 143 SY TYPE SP 12.5 WEAR CRS MIX (2,C) 4.0" THICK 23 L F CONSTRUCT 48" DIA SAN MANHOLE. The Madelia Mobile Village Cooperative, Inc board reserves the right to reject any and all bids and to waive any bids received without explanation. No bid may be withdrawn for a period of 60 days.. For all further requirements regarding Bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents