Similar Projects
Pavement and Structure Rehabilitation
Bidding
NC

Milling, Resurfacing, and Shoulder Grading
Bidding
NC

East Village Infrastructure
Post-Bid
$7,686,825 est. value
Charlotte, NC

Construction Manager for UNC Charlotte East Village Infrastructure
Post-Bid
Less than $6,000,000 est. value
Charlotte, NC

2019 Pavement Repair and Resurfacing Project
Results
Less than $392,000 est. value
Stallings, NC

Resurfacing FY 2020
Results
Less than $5,472,000 est. value
Charlotte, NC

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Bidding

Camp North End CIP Improvements
Post-Bid
Charlotte, NC

Specialized Roadway Construction Services FY20D
Results
Less than $1,660,945 est. value
Charlotte, NC

Lakeview Road Improvements - Clearing of Utilities
Bidding
$20,000 to $40,000 est. value
Charlotte, NC 28272

Construction of Bailey Road and Highway 115 Intersection Improvements
Post-Bid
Cornelius, NC 28031

Specialized Roadway Construction Services FY20C
Results
Less than $1,660,945 est. value
Charlotte, NC

Asphalt Rejuvenating Application Services FY20
Post-Bid
Charlotte, NC 28202

Pavement and Bridge Rehabilitation
Results
NC

Blue Ridge Parkway - Laurel Fork Bridge Replacement
Post-Bid
$10,000,000 est. value

Last Updated 11/08/2019 09:56 AM
Project Title

Construction of the Walker Branch Greenway (South Tryon to Smith Road)

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28273   (Mecklenburg County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes 3,645 LF (0.7 miles) of new greenway construction, including one neighborhood connection and the regrading and paving of the existing Rivergate Parkway greenway connection. The proposed greenway will be an extension of the existing Walker Branch Greenway and will construct a 12-foot-wide greenway for 0.7 miles along Walker Branch Creek and end at Smith Road. The project will include a new 75 -foot-long pre-fabricated, 12-foot-wide bridge. A 165 LF 8-foot-wide connection will be built on an existing Greenway easement connecting Walker Creek Drive to the new greenway. Two overlooks as well as a small connection to the Steel Creek Athletic Association Field will also be constructed. The remaining portion of the existing Walker Branch Greenway that runs alongside the Parkway Shopping center starting at South Tryon Street will be resurfaced.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents