Similar Projects
Elkhorn River Bank Stabilization - City of Scribner and Dodge County
Infrastructure
Conception
$1,000,000 CJ est. value
Scribner, NE 68057

Runway and Taxiway - Fremont Municipal Airport
Infrastructure
Design
$7,300,000 CJ est. value
Fremont, NE 68025

Runway and Taxiway - Fremont Municipal Airport
Infrastructure
Design
$7,300,000 CJ est. value
Fremont, NE 68025

Poehling's Lane Drainage Improvements for Saunders County
Infrastructure
Bidding
$132,000 CJ est. value
Fremont, NE 68025

Ridge Drive Reconstruction
Infrastructure
Post-Bid
$300,000 est. value
Hooper, NE 68031

Paving Reconstruction
Infrastructure
Post-Bid
$300,000 est. value
Scribner, NE

West 16th Street Asphalt Overlay
Infrastructure
Results
$400,000 est. value
Fremont, NE 68025

Clarkson Street Asphalt Overlay
Infrastructure
Results
$400,000 est. value
Fremont, NE 68025

Logan View Public Schools Elementary Addition
Addition, Demolition, Infrastructure
Construction
$2,219,000 CJ est. value
Hooper, NE 68031

Keene Memorial Library Renovation - Bid Package 1
Addition, Renovation, Infrastructure - 34,340 SF
Construction
$6,200,000 CJ est. value
Fremont, NE 68025

Highway 77 Self-Storage
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Inglewood, NE 68025

Morningside Pointe Residential Development Second Addition
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Fremont, NE 68025

Ritz Lake - Phase II
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fremont, NE 68025

Fremont High School Project - Bid Package 4 Site Work
Infrastructure
Post-Bid
$300,000 CJ est. value
Fremont, NE 68025

2022 Grading, Paving, and Sanitary Sewer Improvements
Infrastructure
Results
$305,000 est. value
Inglewood, NE

Last Updated 08/21/2023 08:11 AM
Project Title

Fremont Municipal Airport, Nebraska, Rehabilitate Runway

Physical Address View project details and contacts
City, State (County) Fremont, NE 68025   (Dodge County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $4,166,904 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: Fremont Municipal Airport, Fremont, NE Furnishing all labor, materials and equipment and performing all work necessary to: Rehabilitate Runway 14/32 (2,300' x 100'). In general, this work will require the following approximate quantities: Unclassified Excavation (45,320 CY); 9" Cement Treated Subgrade (27,208 SY); 6" Crushed Aggregate Base Course (26,692 SY); 7.5" Concrete Pavement (26,175 SY); 24" Class IV Reinforced Concrete Arch Pipe (816 LF); Inlet Construction; 4" Perforated Underdrain Pipe (4,573 LF); Airfield Lighting; Pavement Marking; Seeding; Bonded Fiber Matrix Questions regarding bids shall be directed to Heather Olson, P.E., consulting engineer at (402) 938-2460. Contractors bidding shall be pre-qualified by NDOT to construct CONCRETE PAVEMENT or as General, as required by the Instructions to Bidders.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents