Similar Projects
Last Updated | 06/12/2023 09:39 AM |
Project Title | WPC Above Ground Fuel Tanks Project |
Physical Address | View project details and contacts |
City, State (County) | Defiance, OH 43512 (Defiance County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $408,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of 6/12/23 The City is rejecting all bids submitted on May 9, 2023 for the WPC Above Ground Fuel Tanks Re-Bid project. Scope- In general, the work consists of removing the existing underground fuel tanks and associated piping. It also consists of installing new above ground fuel tanks and associated electrical component upgrades in the Maumee Pumping Station control room. The opinion of probable construction costs is $308,000. Neither Owner nor Engineer has any responsibility for the accuracy, complete- ness or sufficiency of any bid documents obtained from any source other than the source indicated in these documents. Obtaining these documents from any other source(s) may result in obtaining incomplete and inaccurate information. Obtaining these documents from any source other than directly from the source listed herein may also result in failure to receive any addenda, corrections, or other revisions to these documents that may be issued. Technical questions regarding the project should be e-mailed to the Project Manager, Daniel M. Yodzis, P.E., dyodzis@jheng.com; at Jones & Henry Engineers, Ltd and copied to the City Engineer, Melinda K. Sprow, P.E., msprow@cityofdefiance.com. Bids must be submitted on the forms bound herein, must contain the names of every person or company interested therein, and shall be accompanied by either a Bid Guaranty and Contract Bond in the amount of 100% of the amount bid with satisfactory corporate surety, or by a certified check on a solvent bank in the amount of not less than 10% of the amount of the Bid, subject to conditions provided in the Instructions to Bidders. The successful bidder will be required to furnish satisfactory Performance Bond and Maintenance and Guarantee Bond in the amount of 100% of the Bid. The Contractor shall be required to pay not less than the prevailing wage rates established by the Ohio Bureau of Employment Services, Wage and Hour Division. Any Bid may be withdrawn prior to the scheduled closing time for receipt of Bids, but no bidder shall withdraw his Bid within 60 days after the actual opening thereof. The Owner reserves the right to reject any or all Bids, waive irregularities in any Bid, and to accept any Bid which is deemed most favorable to the Owner. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |