Similar Projects
Dallas Baptist University Student Housing Phase III
New Construction - 10,500 SF
Design
$2,200,000 est. value
Dallas, TX 75211

West Coast University
Renovation - 136,000 SF
Design
Richardson, TX 75080

Daycare Renovation
Renovation
Bidding
Dallas, TX

Early College High School Student Space Atrium Addition
Addition
Post-Bid
$4,000,000 est. value
Dallas, TX 75212

F-Building 3rd Floor Lab and Office Renovation
Renovation
Post-Bid
TX 75390

BP10.110 Development Office Expansion
Results
Dallas, TX

L3 & L4 Biochemistry Lab Renovations
Renovation
Results
$1,684,302 est. value
Dallas, TX 75390

Paul Quinn College
New Construction, Renovation - 56,600 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Dallas, TX 75241

Southern Methodist University Bridwell Library Phase II
Renovation - 46,700 SF
Construction
University Park, TX 75205

G9/J9 Full Floor Renovation
Renovation - 30,938 SF
Post-Bid
Less than $4,000,000 est. value
Dallas, TX 75390

South Campus TRB Renovation
Renovation
Results
Dallas, TX 75390

Southern Methodist University Perkins Chapel Phase II
New Construction - 7,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Dallas, TX 75205

IT Closet Upgrade North Lake College
Renovation
Results
Irving, TX 75038

North Lake College Construction Sciences Building
New Construction - 96,000 SF
Construction
$25,500,000 est. value
Coppell, TX 75019

Brookhaven College IT Closet Upgrade
Renovation
Results
Farmers Branch, TX 75244

Reported 05/20/2021 12:00 AM
Project Title

UPD BE Building Renovations

Physical Address View project details and contacts
City, State (County) Dallas, TX 75235   (Dallas County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

22,000 SF build-out interior of existing building shell space into new offices, administration spaces, conference rooms. Project includes a training space, dispatch, badging office, exercise room, men’s and women’s locker rooms, quartermaster room, briefing rooms, break room and specialty storage areas. All new finishes, flooring, millwork, interior walls and framing and ceilings. New security system to tie into campus security. Upgrade building entrances as indicated. MEP - New air cooled chiller to support building with associated water pumps and treatment, all new ductwork, terminal units and control system to tie back into main UTSW campus controls. Existing 300KW generator and ATS to be relocated from BK building and setup at BE to serve the new police station. Demolish and remove existing roof top units and patch back roof. All new interior electrical, mechanical and plumbing lines and systems to serve new floor plan

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents