Similar Projects
Pflugerville Water Pipeline Project
New Construction, Infrastructure
Conception
$86,000,000 est. value
Pflugerville, TX

Williamson Creek - Richmond Tributary Rehabilitation
Infrastructure
Conception
Less than $4,200,000 est. value
Austin, TX

Motto Hotel by Hilton
New Construction, Infrastructure - 82,165 SF
Design
$15,000,000 CJ est. value
Austin, TX 78701

George Washington Carver Museum Cultural and Genealogy Center Phase 2A Site Utilities
Renovation, Addition, Build-Out, Infrastructure
Design
$5,100,000 est. value
Austin, TX 78702

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Water Reclamation Facility Plant Farm Ponds Rehabilitation
Infrastructure
Bidding
$200,000 CJ est. value
Midland, TX 79701

Camp Mabry Sanitary Sewer and Water Valves Replacement Construction Project
Infrastructure
Post-Bid
Less than $850,000 est. value
Austin, TX

Capitol Complex, Phase 2
New Construction, Infrastructure
Post-Bid
$225,000,000 CJ est. value
Austin, TX 78701

Redevelopment of 1215 Red River and 606 East 12th Streets
Results
Austin, TX 78701

Lakeway Highlands Phase 2 Section 8
Results
Lakeway, TX

Dutch Bros Coffee - Menchaca Road (TX1201) / Austin
New Construction, Infrastructure - 862 SF
Construction
$500,000 CJ est. value
Austin, TX 78748

1200 Springdale Apartments
New Construction, Infrastructure
Construction
$47,000,000 CJ est. value
Austin, TX 78721

Dutch Bros Coffee TX1202 / Austin
New Construction, Infrastructure - 871 SF
Pending Verification
$250,000 CJ est. value
Austin, TX 78754

QuikTrip #4190 / Manor
New Construction, Infrastructure - 4,993 SF
Pending Verification
$475,000 CJ est. value
Manor, TX 78653

Shoal Creek - MoPac/Steck Water Quality Ponds Retrofit - 5282.156 - City Of Austin
Alteration
Conception
Less than $695,000 est. value
Austin, TX 78799

Last Updated 12/01/2022 11:17 AM
Project Title

TACC CHW Piping Corrosion Mitigation

Physical Address View project details and contacts
City, State (County) Austin, TX 78758   (Travis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $537,905 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The University of Texas at Austin (the Owner) has posted a Request for Competitive Sealed Proposal (RFCSP) on behalf of Utilities and Energy Management. This project will mitigate corrosion in the chilled water system that cools all of University of Texas at Austin Texas Advanced Computing Center (TACC) Supercomputers. The scope includes a new sand filter, duplex strainers inside the TACC, piping replacement, flush and passivation of new and existing piping, test and balance on chilled water flow, and a new corrosion coupon monitoring rack.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents